Mana

g

e

m

ent of C

h

an

g

e

BOS-PRD-06.900701

Version 04. Original date: 24/05/2012. Version date: 31/12/2014. Valid version only on QMS site. Uncontrolled document when printed.

Procedure prepared by: BOS QHSES Manager. Approved by: BOS Managing Director. Validated by: BOS Quality Representative.

13 / 21

x

Ensuring suitably qualified and experienced personnel for carrying out and supervising the

equipement change.

4

.

7

.

4

Ac

t

i

on an

d

c

o

mmu

n

ic

at

i

on

p

lan

Consult and follow pre-task safety requirements. Identify the stages of work in the risk assessment to form

the basis of a plan which can be passed to the responsible person for approval. The plan

shall

include, and

allow time for, the following items:

x

Identification of stakeholders;

x

Completion of job risk assessment (based on analysis of the steps in the task);

x

Compilation of risk control measures;

x

De-conflicted schedule of work (including preparations such as docking or tank cleaning) with one

person allocated as responsible for ensuring completion of each task;

x

Issue of Permits to Work (PTWs);

x

Commissioning;

x

Familiarisation or training to new/modified equipment;

x

Trial (as applicable);

x

Communication plan (showing who needs to know what in order to proceed the job safely);

x

Tool Box Talk (TBT) preparation;

x

Submission of change documentation to Quality and HSE for quality/safety check;

x

Authorisation to proceed;

x

Completion of documentation and maintenance records (especially the change to Ship Fit Definition

and logistic support requirements).

4

.

7

.

5

A

pp

r

o

v

al

x

Submit plan to

C

hi

ef En

gi

nee

r

o

r Su

p

e

ri

nten

d

ent

for scrutiny;

x

Obtain approval from

Te

ch

n

ic

al Mana

g

e

r

.

The approval process for changing an equipement

shall

also fully comply with BOS expenditure approval

procedure BOS-PRD-17.0001-fr

–

Procé

dure d’approbation des dépenses

.

The action and communication plan

shall

be submitted allowing sufficient time for scrutiny and

amendment before the work is due to commence.

4

.

7

.

6

I

m

p

le

m

entat

i

on

, m

on

i

to

ri

n

g

an

d

a

ss

e

ssm

ent

The

Te

ch

n

ic

al Mana

g

e

r

or (assigned role) is responsible for :

1. Carrying out a pre-start review for changes that require one before commissioning;

2. Checking if MoC is being performed as per MoC Plan. If not, MoC Plan has to be reviewed

and reapproved;

3. Ensure that a post change review is conducted when all actions are completed.

4. Ensure lessons learned are documented and shared with stakeholders;

5. Ensure MoC is closed (sign off approval authority);

6. Record and file documentation in MoC register.

4

.

7

.

7

D

o

cum

entat

i

on

Documentation is to be completed, updated and provided as follows :

x

Technical documentation (e.g. drawings, technical change report, etc...) ;

x

Operating documentation (procedures, instructions, etc...);

x

Trial reports (as applicable);

x

Maintenance database (Task Assistant software : frequency of tasks, nature, reports, etc

…

);

471