Mana

g

e

m

ent of C

h

an

g

e

BOS-PRD-06.900701

Version 04. Original date: 24/05/2012. Version date: 31/12/2014. Valid version only on QMS site. Uncontrolled document when printed.

Procedure prepared by: BOS QHSES Manager. Approved by: BOS Managing Director. Validated by: BOS Quality Representative.

16 / 21

4

.

8

.

7

D

o

cum

entat

i

on

Documentation to be released as per list provided in

Completed New Built Vessel Handover Protocol

.

4

.

9

C

h

an

g

e of ve

ss

el o

p

e

r

at

i

n

g

c

on

d

i

t

i

on

s

This procedure highlights what needs to be achieved in order to ensure the change in operating condition (or

maintenance/inspection routines) does not compromise safety or increase risk to the environment or asset.

The bulk of the work associated with these changes is risk assessment and understanding the full extent of

the reasoning behind the current limits. These changes can only be implemented when the control measures

are fully developed and implemented.

The

A

ppr

oval A

u

t

h

o

ri

ty

for vessels change of operating conditions

should

be the

O

p

e

r

at

i

on

s

Mana

g

e

r

(can be delegated to the

Te

ch

n

ic

al Mana

g

e

r

as applicable). Prior to authorisation there

shall

be a record of

consultation with the

Ma

s

te

r

/C

hi

ef En

gi

nee

r

of all the vessel(s) affected.

The

C

h

an

g

e Coo

r

d

i

nato

r

shall

revisit the consultation process in the event that it is not possible to

implement the control measures prior to changing the procedure.

The change in operating conditions (or maintenance/inspection routine)

shall

undergo a trial period before

the

MoC form

can be filled out and the task formally closed.

4

.

9

.1 I

d

ent

i

f

ic

at

i

on of t

h

e nee

d

to

ch

an

g

e

The reason for the change are to be included in the

MoC Form

as this

shall

focus on the risk assessment

process. Examples of reasons include:

x

Main engine lubrication oil analysis indicates oil changes are too frequent;

x

Hydraulic power pack manufacturer has reduced recommended maintenance routine.

4

.

9

.

2

Ris

k a

ss

e

ssm

ent

Identify all stakeholders e.g.:

x

Equipment supplier;

x

Operational/Technical staff ashore;

x

Ma

s

te

r

;

x

C

hi

ef En

gi

nee

r

;

x

Other Departments affected;

x

Safety and Quality Management teams;

x

Client;

x

Bo

urb

on

Subs

ea Cont

r

a

c

t Mana

g

e

r

and

Bo

urb

on

Subs

ea H

S

E Mana

g

e

r

in case of MPSV.

Consult all stakeholders.

Assess the risks associated, including :

x

Risks to personnel safety and the environment;

x

Risk of catastrophic failure;

x

Risk of fire;

x

Effect on ship stability or watertight integrity;

x

Risk associated with change of demand on ship’s s

ervices such as electrical load;

x

Effect of changed procedure on ships programme

–

reducing frequency of stores delivery;

x

Effect of change on ships programme

–

reducing frequency of a mandatory maintenance routine

may increase vessel availability but then present problems regarding crew fatigue or scheduling

other maintenance.

x

Deficiency of training / familiarization to new operating conditions.

474