Mana

g

e

m

ent of C

h

an

g

e

BOS-PRD-06.900701

Version 04. Original date: 24/05/2012. Version date: 31/12/2014. Valid version only on QMS site. Uncontrolled document when printed.

Procedure prepared by: BOS QHSES Manager. Approved by: BOS Managing Director. Validated by: BOS Quality Representative.

9 / 21

4.4

T

e

mp

o

r

a

ry

an

d

e

m

e

rg

en

c

y

c

h

an

g

e

s

T

e

mp

o

r

a

ry

c

h

an

g

e

s

:

These changes are intended to exist for a short, predetermined and finite period. The

time frame of validity of the change

shall

be identified in the risk-assessment and documented in the MoC

Plan.

The

MoC Form

shall

also specify the date and frequency when risk assessment requires to be reviewed. As

a minimum, it will be at the end of determined duration of the temporary change, this to avoid that temporary

change becomes permanent without any control. But depending of the level of risk, it can be carried out

before the time limit.

If temporary changes needs to become permanent, then new MoC

should

be released according to this

decision and the present procedure.

E

m

e

rg

en

c

y

c

h

an

g

e

s

:

In case change must be implemented in emergency situations :

x

The change

should

only be permitted on the authority of the

O

p

e

r

at

i

on

s

Mana

g

e

r

,

t

h

e L

i

ne

Mana

g

e

r

or above.

x

As a minimum, a Risk Assessment covering the approved change

shall

be conducted and

communicated to all affected personnel prior to recommencing operations.

x

The emergency change

should

be subjected to the normal Management of Change procedures at

the earliest opportunity.

4.

5

L

ik

e

-

fo

r-

l

ik

e

r

e

p

la

c

e

m

ent

Like-for-like replacement does not require a MoC.

Like-for-like replacement means :

- Same specification including material(s), old construction, dimension, height.

- Same service : process conditions including pressure, temperature, process materials. Inspection

and maintenance

should

be the same.

- Procedural replacement meaning routine operation (replacement not due to failure).

- Genuine replacement, not an improvement : if the purpose of the replacement is to upgrade the old

part then it is not in-kind.

4.

6

C

h

an

g

e of

p

e

rs

onnel an

d

/

o

r

o

rg

an

is

at

i

on

This chapter highlights what needs to be achieved in order to ensure that changes in a safety critical

person

’

s role or organisation are properly managed and inducted into the Company.

Failing in this process may not present immediate hazards, however unmanaged risks

shall

manifest

themselves as incidents after a period of time and failure to carry out a thorough risk assessment at this

stage may lead to increased likelihood of incidents.

The list of risks featured here is not exhaustive but is supplied as a prompt to help the

C

h

an

g

e Coo

r

d

i

nato

r

and

Re

sp

on

sib

le Mana

g

e

rs

focus on the processes as each action plan will be unique to the individual and

the operational circumstances at the time.

The feedback loops exist to encourage the

C

h

an

g

e Coo

r

d

i

nato

r

to revisit the consultation process in the

event that it is not possible to compile and execute a suitable action plan.

467