BOS-PRD-06.900701

Version 04. Original date: 24/05/2012. Version date: 31/12/2014. Valid version only on QMS site. Uncontrolled document when printed.

Procedure prepared by: BOS QHSES Manager. Approved by: BOS Managing Director. Validated by: BOS Quality Representative.

8 / 21

4.

2

MoC

d

o

c

um

entat

i

on

pr

o

c

e

ss

an

d

r

ev

i

e

w

All changes meeting the criteria of the present procedure

shall

be documented using the

BOS-FRM-06.0002

– Management Of Change

.

A MoC register recorded on BOS Intranet consolidates the details of all MoC raised by the Company. The

completed MoC forms and supporting documentation

shall

be archived for a period of 3 years from the date

of MoC closure.

MoC Coo

r

d

i

nato

r

shall

ensure that the MoC form, once filled out by

MoC

I

n

i

t

i

ato

r

, is given a MoC number

as follows :

MoC [ve

ss

el o

r

D

p

t a

br

ev

i

at

i

on] [YYYY]-[

i

n

c

r

e

m

ental n

umb

e

r

]

E.g: MoC AILET 2014-01

Vessels and Departments abbreviations are listed in

BOS-SPC-11.0002 – BOS Vessels and Department

Abbreviation

.

When change is supported by

MoC

I

n

i

t

i

at

i

o

r

and

L

i

ne Mana

g

e

r

(Step 1 passed), MoC forms and related

documents

shall

be :

- filed on BOS Intranet by the

MoC Coo

r

d

i

nato

r

,

- updated through the approval process,

- archived with all signatures when closed. Scanned, electronic files are accepted as records for MoC

purposes.

When

MoC

I

n

i

t

i

ato

r

’s work position is located onboard vessel, the M

oC

shall

also be filed on the vessel.

MoC forms that are indeed onboard a vessel

shall

be easily accessible on the Bridge and other applicable

locations.

Efficiency and proper application of MoC procedure will be checked during annual process review carried out

by

Qu

al

i

ty Re

pr

e

s

entat

i

ve

. Records of MoC and related documents

shall

be controlled at that time to

ensure that the changes have been implemented according to plans. Any improvement identified will be

recorded in the process review report.

4.

3

C

r

ee

pi

n

g

c

h

an

g

e

Incremental changes in a defined scope/system could over time pose a significant risk, and in the MoC

process is identified as a

c

r

ee

pi

n

g

c

h

an

g

e

. Creeping change is often hard to detect, due to changes

evolving over both time and by more than one initiator.

Examples could be:

- modifying several components within a system over time, such that if all changes were to be done

simultaneously a MoC would be required due to overall impact, whereas incremental steps does not require

a MoC.

- A significant number of

S

en

i

o

r

Off

i

c

e

rs

reaching the retirement age limit within a short range of time,

causing a recruitment challenge and a potential major loss of competence.

All

P

r

o

c

e

ss

O

w

ne

rs

have the responsibility to keep abreast of any changes in external

legislation/guidelines/practices over time, that could have a potential MoC impact, and incorporate such

changes in their process activities through MoC.

The principles of MoC

shall

be observed by all onshore and offshore personnel performing any changes to a

set scope/scenario/system in order to evaluate if the current change could be part of an incremental/creeping

change.