Mana

g

e

m

ent of C

h

an

g

e

BOS-PRD-06.900701

Version 04. Original date: 24/05/2012. Version date: 31/12/2014. Valid version only on QMS site. Uncontrolled document when printed.

Procedure prepared by: BOS QHSES Manager. Approved by: BOS Managing Director. Validated by: BOS Quality Representative.

5 / 21

C

h

an

g

e

i

n ope

r

at

i

n

g

c

on

di

t

i

on

s

:

x

Maintenance;

x

Inspection;

x

Operating area;

x

Client and contracted scope of services;

x

Contracts (including cost schedules);

x

Regulations;

x

Operating parameters (including but not limited to: pressures, temperatures, equipment settings,

weather limitations, manpower limitations etc.).

C

h

an

g

e

i

n ope

r

at

i

n

g

a

r

ea

i

n

c

l

ud

e follo

wi

n

g

a

s

pe

c

t

s

to

c

on

sid

e

r

:

x

Visas;

x

Logisitics;

x

Vaccinations and Health;

x

Security;

x

Safety requirements and specific training (example of BOSIET that needs to be OLF approved for

Norway, specific SOPEP plan for Brazil or US);

x

Difficulties in providing spares or specific equipment (medicine, pyrotechnics,etc

…

).

C

h

an

g

e

i

n p

r

o

c

ee

di

n

g

:

x

Change in conditions comparing to planning (monitored onsite prior doing a task) : different weather

condition, personnel, equipment, arrangement, distance;

x

Significant addition of work that was not stipulated in the procedure;

x

Change in the task orders to perform a job.

C

h

an

g

e

i

n e

x

te

r

nal fa

c

to

r

:

x

New regulation entering into force in country of operation and having a potential impact on operation;

x

Significant modification in the country or area of operation that could impact operation (war, security

threat, natural disaster, social pressure).

3

R

e

s

pon

s

ab

i

l

i

t

y,

a

u

t

h

o

ri

t

y,

an

d

a

cc

o

u

ntab

i

l

i

t

y

Gene

r

al

d

ef

i

n

i

t

i

on

s

:

C

h

an

g

e

I

n

i

t

i

ato

r

:

Person identifying a change and instigating a change according this MoC procedure.

-

He’s

in charge to submit the change to their line management, to identify the associated risks and to

develop the mitigation plan with all stakeholders.

- He submits approval of relevant Authority to launch the MoC process and for signing off on

completion of the change.

L

i

ne Mana

g

e

r

:

The person accountable for initial approval or rejection of a proposed Change by the Change

Initiator.

C

h

an

g

e Coo

rdi

nato

r

:

Person responsible and accountable to lead and manage the change process. He

may also be the

C

h

an

g

e

I

n

i

t

i

ato

r

.

- He is in charge to build a competent team composed of relevant stakeholders if required by the

complexity of change.

- He has the responsibility to supervise the right application of the MoC process and to ensure the

completion of the MoC within the timeframe, typically 3 months.

- He reports progress to the

C

h

an

g

e

I

n

i

t

i

ato

r

, stakeholders and Approval Authority.

- He reviews the process on completion of the change and transfer lessons learned to the rest of the

organisation if required.

App

r

oval A

u

t

h

o

ri

t

y

:

The person accountable for approving each change process steps and for signing-off

on completion of the Change. It must be a different person to the

MoC Coo

rdi

nato

r

, at a more senior level,

and the most appropriate to the nature of the change.