Correcti

v

e

A

ction

P

rocedure

BOS-PRD-1201.901201

The criteria that will be considered are in particular:

x

Risk reduced by the measure (probability/gravity);

x

Cost of the measure or cost reduction induced by the measure;

x

Way it reduces the difficulty of the task(s);

x

Way it improves the well-being of employees (equipment, work equipment)

x

How communication is improved by the proposal.

4

.

2

.

2 S

itu

a

tion

R

e

p

ort

Potential non-conformities, suggestions, remarks or complaints

shall

be filled in the

Situation Report

form by

all

Em

p

loyee

s

and handed over to the

Q

u

a

lity

R

e

p

re

s

ent

a

ti

v

e. O

p

er

a

tion

s

M

a

n

a

ger

shall

be in copy of

any Situation Report raised onboard vessels.

Examples of situation(s) that may be reported through the Situation Report tool are (but not limited to):

x

Suggestion relative to the design of an equipment (especially after delivery) or to notify a solution

found to improve the design of a same series of vessels (as for e.g. noise level, fire flaps…);

x

Improvement of the BOS Company Management Systems;

x

Situation(s) that slow down the activity of the Company;

x

Medicine logistic problems;

x

Crew change difficulties;

x

Excessive delivery times;

x

Reception of material and/or equipment not compliant to what have been ordered, equipment not

fitted for the operations or with bad quality, equipment not compliant to the international, national

laws and regulations;

x

Operations that need to find solution with

Third

p

a

rtie

s

and/or

Contr

a

cting Com

p

a

nie

s

;

x

Any Clients complaints or suggestions;

x

Recurrence of the same problems.

Depending of the situation reported, the

Q

u

a

lity

R

e

p

re

s

ent

a

ti

v

e

shall

classify the situation as follow:

x

Irrevelant, when the situation reported has been identified not threatening the activities or already

raised through previous situation report(s) and followed-up;

x

Relevant, when the situation reported may have an impact on the activities.

In this case, he/she

shall

raise:

o

A quality corrective action if the non-conformity or observation already occurred or,

o

A preventive action if, as detailed in the

Preventive Action Guidelines

, the non-

conformity/situation has not occurred but may occur.

4

.

2

.

3

Q

u

a

lity Correcti

v

e

a

ction

As described in the

Quality Corrective Action Flow-Chart

, if the situation reported is relevant and if the

situation analysed has already occurred, the

Q

u

a

lity

R

e

p

re

s

ent

a

ti

v

e

shall

grade in the

Description of Non-

Conformities and Observations

form the non-conformity as minor-conformity, major non-conformity, or

observation. Non-conformities, observations, and their supporting evidences

shall

be recorded.

x

When an observation is detected, the

Q

u

a

lity

R

e

p

re

s

ent

a

ti

v

e

shall

issue a recommendation for

improvement. Recommendations issued from observations are not binding, although they represent

an opportunity for improvement.

x

Minor and major non-conformity

shall

be sent immediately to the respective

P

roce

ss

O

w

ner

. Once

understood, the

P

roce

ss

O

w

ner

shall

designate an

I

m

p

lement

a

tion

R

e

sp

on

s

i

b

le

. A Quality

Corrective Action

shall

be issued by the

I

m

p

lement

a

tion

R

e

sp

on

s

i

b

le.

Feedback

shall

be provided

to the

I

niti

a

tor

and to the

Q

u

a

lity

R

e

p

re

s

ent

a

ti

v

e

of any non-conformity and if appropriate to other

areas within the Company.

If the situation reported is irrelevant, the

Q

u

a

lity

R

e

p

re

s

ent

a

ti

v

e

shall

close and file the

Situation Report.

The

Em

p

loyee

that raised the situation

should

be informed of this decision.

Version 02. Original date: 05/06/2012. Version date: 31/12/2014. Valid version only on QMS site. Uncontrolled document when printed.

Procedure prepared by: BOS QHSES Manager. Approved by: Quality Director of BOURBON. Validated by: Quality Director of BOURBON.

This QMS document is validated as compliant to BOURBON standards (

http://intranet.bourbon-online.com/QMS )

.

7 /13

Transposition from Corporate original (last

version date:07/08/12)

728