When suitable access equipment is provided from the ship or from the shore or from another ship, any

person boarding or leaving the ship

shall

use that equipment.

4

.

4

.1

L

i

g

h

tin

g

an

d

sa

f

e

m

o

v

e

m

ent

Adequate lighting over the whole length of the means of access and a life-buoy readily available at the ship

board end

shall

be maintained.

The means of access and its immediate approaches

shall

be kept free from obstruction and, as far as

reasonably practicable, kept clear of any substances likely to cause a person to slip or fall. Where this is not

possible, appropriate warning notices

shall

be posted and if necessary the surfaces suitably treated.

No electric lights connected to wandering electrical leads

shall

be used for illuminating the means of access.

4

.

4

.

2 S

a

f

et

y

nets

An adequate number of safety nets of a suitable size and strength area

shall

be carried on the ship or

otherwise be readily available. The aim of safety nets is to minimise the risk of falling between the ship and

quay or falling onto the quay or deck and as far as reasonably practicable the whole length of the means of

access

shall

be covered. Special attention

shall

be given to the keyside end of the gangway. Safety nets

shall

be securely rigged, with use being made of attachment points on the quayside where appropriate.

4

.

4

.

3 L

i

f

e

-bu

o

y

s

A life-buoy with a self-activating light and also a separate buoyant safety line attached to a quoit or some

similar device

shall

be provided ready for use at the point of access aboard the ship.

4

.

4

.

4 S

e

cu

rit

y

Security measures and controls are dealt with in the Ship Security Plan as provided.

Version 04. Original date: 22/06/2012. Version date: 31/12/2014. Valid version only on QMS site. Uncontrolled document when printed.

Procedure prepared by: BOS Operations Department Project Coordinator. Approved by: Head of Operations. Validated by: BOS Quality Representative