Table of Contents Table of Contents
Previous Page  404-Mooring Operations / 748 Next Page
Information
Show Menu
Previous Page 404-Mooring Operations / 748 Next Page
Page Background

Moorin

g Op

erations

BOS-PRD-07.900607

If for any reason shore mooring gangs are not available to let the ship go then the mooring lines

shall

initially

be run as bights, with the line lead around the shore bollard and the eye then returned onboard, so they can

then be brought in without the need for ships personnel to remain on the shore during the unberthing

operation.

4.

3

Maintenan

c

e o

f

m

oorin

g

e

qu

i

p

m

ent

4.

3

.1

P

lanne

d

m

aintenan

c

e

The correct operation of the mooring equipment onboard is essential to the overall safe operation of the ship

in port. All parts of the mooring system

shall

be incorporated into the ships planned maintenance system.

All rotating parts

shall

be moved and greased on a regular basis via grease nipples and the ways being kept

clean and in good condition. Particular attention

shall

be paid to roller fairleads and rotating deck stands as

these often suffer from neglect and little use. Rollers and fairleads

should

turn smoothly and a visual check

made that corrosion has not weakened them.

Surfaces of fairleads, bollards, bits and drum ends

shall

be kept clean and maintained in good condition.

Regular inspections

shall

be made of the winch brake linings. Oil, moisture or heavy rust on brake linings or

drums can seriously reduce the brake holding capacity, in extreme cases by as much as 75%.

Moisture can be removed by running the winch with the brake applied very lightly, although care

shall

be

taken not to cause excessive wear. When oil has impregnated into the brake lining, this cannot be removed

and any lining which has been affected

shall

be replaced at the earliest opportunity. The possible reduction

in any winch brake holding capacity

shall

be taken into account when deciding upon the mooring pattern to

be used.

Whenever brakes are opened up for any reason, the brake drum

shall

be examined for build-up of rust or

worn brake material and

shall

be de-scaled as necessary.

Brake linkages

shall

be free to move. If the linkages are not free then there

shall

be a loss in the brake

holding capacity. The operator may be under the impression that the brake has been fully applied when in

fact it has not or the brake mechanism is hardened up using lever bars which may in turn impose high

stresses on some of the mechanical parts of the brake.

Prior to a mooring operation which follows an extended sea passage or a passage undertaken in heavy

weather, the winches that have been exposed

shall

be checked to ensure that all control and operating

levers and linkages are oiled or greased and are free and easy to use and that the brake drums and linings

are clean and suitably dry.

The deck areas at mooring stations

shall

have anti-slip surfaces provided by fixed treads or by painting with

anti-slip paint.

Records

shall

be maintained of all inspections and maintenance carried out on the mooring system.

All mooring equipment

shall

be certified. This means that for mooring ropes at least a batch certificate

shall

be available on board the vessel.

All mooring equipment like bollards, fairlead rollers etc

shall

be marked with their SWL.

All mooring lines

shall

be marked in order to be identified using color collars (and associated to their relevant

certificates).

The mooring lines in use

shall

be visually controlled on monthly basis as per the PMS system requirements.

Version 04. Original date: 22/06/2012. Version date: 31/12/2014. Valid version only on QMS site. Uncontrolled document when printed.

Procedure prepared by: BOS Operations Department Project Coordinator. Approved by: Head of Operations. Validated by: BOS Quality Representative

10 / 19

404