BOS-PRD-07.900607

with care being taken to ensure that the leads are correct so as to avoid the possibility of chaffing between

different lines. Wires or other ropes leading from power winches

shall

not have lengths of slack lying on the

deck where they can present a hazard to personnel from bights being formed or uncontrolled run back.

4

.

2

.

4

Moorin

g P

osition

During mooring, the officer at the poop deck

shall

inform the

Master

when the ship is "in position". This

means the ship is positioned alongside in order to lower the ramp without being obstructed.

At most regularly visited berths this position has already been indicated by a marker on the key-side. New

ports/berths are suggested to be marked subject to Port Regulations.

4

.

2

.

5

Hea

v

in

g L

ines

At each mooring station at least two heaving lines of sufficient length, made up and ready for use

shall

be

available. The end of the heaving line may be made up from a traditional monkey fist or other knot to provide

sufficient weight to allow the line to be thrown effectively. The use of metal or other heavy inserts, paint

impregnated knots etc. to provide weight can prove hazardous to shore personnel and are not permitted.

4

.

2

.

6 S

to

pp

ers

At each mooring station a sufficient number of stoppers

shall

be available for ropes or wires which may

require to be transferred from a drum end to bits.

It is essential that the correct type of stopper is used on any occasion. Only synthetic stoppers

shall

be used

on synthetic lines and chain or specially designed (carpenters) stoppers

shall

be used on wires.

When a mooring station is ready, a report

shall

be made to the bridge.

4

.

2

.

7

Moorin

g S

tations

Winch controls

shall

only be operated by experienced and qualified seaman. At no time when the winches

are in operation are the controls to be left unattended, locked or tied back in an operating position. The

operation at each mooring station

shall

be co-ordinated by the officer or other person in charge. He

shall

be

correctly positioned clear of any danger areas while maintaining visual contact with the winch controller and

over side activities. On ships designed with ship side winch controls or wandering control boxes care

shall

be

taken to ensure that wires or ropes are stowing correctly on the drums.

The winch brake is a static device intended for holding a mooring line and is not to be used as a means for

controlling a line being slacked down. When a line has to be slacked down, then the winch

shall

be put in

gear, the brake released and the line walked back under power. A line

shall

never be slacked down by

releasing the brake without the winch being in gear as this can cause uneven wear on the brake band,

resulting in a reduction in the brake holding capacity.

The running of numerous lines when appropriate man power is not available

shall

be avoided. Personnel

shall

be assigned only one task at any time. Care

shall

be taken when running lines that they do not foul the

propeller or any thrusters. Care

shall

also be exercised when lowering any line into a mooring boat so as to

prevent injury to its crew members. The line

shall

have sufficient slack to enable the mooring boat to make

easy progress to the shore or mooring dolphin but not an excessive amount which

shall

result in it fouling the

sea bed.

When a rope is being worked on a drum end, then in addition to the person tending the line, a second person

shall

be available to clear away and stow the line as it is hove in, as well as being available to apply a

stopper prior turning up on the bits. Ropes

shall

not be left on a drum end (warping drum).

Version 04. Original date: 22/06/2012. Version date: 31/12/2014. Valid version only on QMS site. Uncontrolled document when printed.

Procedure prepared by: BOS Operations Department Project Coordinator. Approved by: Head of Operations. Validated by: BOS Quality Representative