Moorin

g Op

erations

BOS-PRD-07.900607

If the

Master

decides that the second anchor

should

be dropped, then this operation

shall

be carefully

co-ordinated between the bridge and focsle to ensure the anchor is dropped in the correct position in relation

to the first.

Personnel

shall

be advised of the added danger when handling anchors during periods of heavy weather.

4

.

5

.

4

Hea

v

in

g

an

c

h

or

All personnel involved in heaving the anchor

shall

be fully briefed about the operation and reminded of the

safety precautions to be observed. All personnel

shall

wear the appropriate safety clothing and equipment

including safety shoes, gloves, safety hat and goggles. At night each member of the anchor party

shall

be

equipped with a suitable torch.

Prior to commencing the operation, the communication links between the bridge and focsle

shall

be tested.

4

.

5

.

5 S

e

cu

rin

g

t

h

e an

c

h

or

f

or sea

Prior to proceeding to sea after leaving an anchorage or port, the anchors

shall

be fully secured. All anchor

securing fittings

shall

be in good condition. The person(s) carrying out the securing operation

shall

be fully

aware of the method to be used.

The position of the anchor

shall

be checked to ensure it is fully home in the hawse pipe and hard against the

hull. Any movement of the anchor in heavy weather has the potential of damaging the hull.

When at sea the windlass

shall

be left out of gear. This enables the anchors to be dropped in an emergency

without the need for windlass power. All power to the windlass

shall

be isolated.

All covers

shall

be fitted to the hawse and spurling pipes. The security of the chain locker watertight doors or

hatches

shall

be checked.

When the anchors have been secured a report

shall

be made to the bridge by the person carrying out the

operation. A responsible officer

shall

check the anchor securing arrangements and a comment on the anchor

security noted in the Log Book.

4

.

5

.

6

Markin

g

t

h

e an

c

h

or

c

a

b

le

The cable is to be well marked to indicate the number of each shackle length, counting from the anchor

towards the chain locker, even during the hours of darkness.

4

.

5

.

7 B

itter en

d

The inboard or bitter end of the anchor cable

shall

be capable of being release in an emergency. It is

recommended that the bitter end of the cable can be released by a person from outside the chain locker. The

bitter end securing arrangement

should

be designed such that the cable cannot be inadvertently released

but can be easy released if required. The bitter end arrangement

shall

be occasionally inspected to ensure it

is free to move if required.

4

.

5

.

8 C

h

ain lo

c

ker

The chain locker

shall

be kept as free as possible of sediment by the use of the cable washers. When the

cable has been heavily contaminated additional hoses

shall

be used to clean the cable.

If a build up of sediment is observed in the chain locker then attempts

shall

be made to clean the locker

before the draining system becomes blocked.

Version 04. Original date: 22/06/2012. Version date: 31/12/2014. Valid version only on QMS site. Uncontrolled document when printed.

Procedure prepared by: BOS Operations Department Project Coordinator. Approved by: Head of Operations. Validated by: BOS Quality Representative

14 / 19