Moorin
g Op
erations
BOS-PRD-07.900607
4
.
7
.
4 E
q
u
i
p
m
ent
m
aintenan
c
e
,
ins
p
e
c
tion an
d
testin
g
Refer to
ship’s PMS
for maintenance of these equipment.
Cables are not exposed to excessive chafing as long as the fairlead is working properly. However, it’s good
use to change the cable contact point every week when possible.
When the ship is holding on its cables, make regular checks of proper functioning of the fairleads (Ex: Rust
development could jam the roller against the body or rotation of the fairlead around her horizontal axis).
Concerning the cables condition, same instructions about maintenance
shall
be applied as for the anchor
handling cables, unless an agreement with the client sets it in another way about replacement period.
Regular greasing through nipples
shall
be done while moving the rotating parts.
Fail-Safe break
shall
be adjusted according to PMS instructions (or manufacturer’s ones) as a consequence
of the normal wear of the winch. This
shall
also be done when the lining is replaced.
Electric connections, general greasing, brake’s lining, coupling gear, high tension alarm, hydraulic oil
shall
be
checked and maintained as per PMS or manufacturer’s instructions.
Tension meter
shall
be checked and recalibrated according to
PMS
.
Propulsion
shall
be tested every week if ship is not moving or using propulsion for a long period in order to
avoid big amount of shell and seaweed on propeller.
5
R
e
c
or
d
s
x
Log Entries
x
Maintenance Records
x
JSA/TBT
6
R
elate
d d
o
cu
m
ents
x
B-GDL-03.0007 – OSM Procedure
x
COSWP for Merchant Seamen
x
Ship Security Plan
7
Ter
m
s an
d d
efinitions
AH Vessel
Anchor Handling Vessel
An
c
hors
p
attern
This is the deployment agreed for the anchors on the bottom. A sketch is provided by the client to fix it.
Ob
str
uc
tion
There could be obstructions on the bottom. On a field, pipelines, electric power cables and sometimes debris
are encountered.
Version 04. Original date: 22/06/2012. Version date: 31/12/2014. Valid version only on QMS site. Uncontrolled document when printed.
Procedure prepared by: BOS Operations Department Project Coordinator. Approved by: Head of Operations. Validated by: BOS Quality Representative
18 / 19