BOS-PRD-07.900604
4
.
3
.
6 L
oad inte
g
rit
y
and sta
b
ilit
y
x
Loads
shall
not exceed dynamic and/or static capacities of the lifting equipment;
x
The integrity and stability of loads
shall
be verified before lifting.
4
.
3
.
7 L
iftin
g
of
p
ersonnel
x
Lifting of personnel
shall
be avoided unless the risk has been demonstrated as being low as is
reasonably practicable;
x
Lifting of personnel
shall
be in accordance to the specific personnel lifting plan for that lift;
x
Lifted personnel
shall
be properly secured with lanyards unless written procedures and risk
assessment require otherwise.
4
.
3
.
8 L
iftin
g
o
p
erations flow
-c
h
art
The following flow-chart and brief description define every step within the Lifting process. The steps remain
the same for each location and work activity. However, the competent person
shall
decide which lifts lie
within the appropriate planning route.
Version 04. Original date: 28/06/2012. Version date: 31/12/2014. Valid version only on QMS site. Uncontrolled document when printed.
Procedure prepared by: BOS Operations Department Project Manager. Approved by: BOS Head of Operations. Validated by: BOS Quality Representative.
8 / 20