BOS-PRD-07.900604

4.

3

P

rin

c

i

p

als for

c

ond

u

c

tin

g

liftin

g

and

h

oistin

g

o

p

erations

4.

3

.1

P

lannin

g

x

A Lifting Plan is required for every lift;

x

If the lift deviates from the plan, make safe and STOP the lift;

x

Hazard identification and risk assessment

shall

be an integral part of planning a lift;

x

An assessment of the lift and determination of the lift method, equipment and number of people

required are critical to planning of a lift.

x

For heavy lifts, a weather forecast

shall

be used when assessing the risks during the load / offload

planning. In addition, routing services might be used during transit

4.

3

.

2

C

ontrol

x

One person in the lift team

shall

be designated as the Person In charge of the Lifting (PIC) operation

(referred to as

P

I

C

);

x

The

P

I

C

shall

review the Lifting Plan and ensure that the required controls are in place and the lift is

carried out following the plan;

x

The

P

I

C

shall

ensure that the lift team has tested and understood visual or radio communications

prior to the lift;

x

All personnel involved in the operation

shall

have their individual responsibilities clearly allocated;

x

All people

shall

be kept clear of overhead loads and areas of potential impact;

x

Manual load handling

shall

not be used to stop a swinging load and

shall

only be performed below

shoulder height.

4.

3

.

3

C

o

m

p

eten

c

e

, T

rainin

g

on

b

oard and trainee.

x

All persons involved in planning/performing lifting and maintaining lifting equipment

shall

be trained

and competent for their role;

x

Refresher training on board and periodic assessment is necessary to assure competence.

x

T

rainin

g

on

b

oard

is a period of familiarization under non-working conditions based on interactive

pedagogical support and equipment practice. The

T

rainin

g

on

b

oard

is completed when a full

competence assessment has been performed and verified.

Master or

S

enior

O

ffi

c

er

can validate

the

trainin

g

on

b

oard

and

shall

endorse in the

Seafarer Training and Experience Log Book

.

4.

3

.4

E

q

u

i

p

m

ent

x

Equipment

shall

be fit for its intended purpose and operating conditions and

shall

be designed to a

recognised standard;

x

Equipment

shall

be fitted with appropriate safety devices;

x

Any safety device fitted on equipment

shall

be operational and not over-ridden.

4.

3

.

5 R

eq

u

ire

m

ents for ins

p

e

c

tion

,

m

aintenan

c

e and

c

ertifi

c

ation

x

Equipment integrity

shall

be maintained and supported by an equipment register;

x

Lifting equipment and devices

shall

undergo detailed and thorough examination by a competent

person at least every 12 months and at least every 6 months for ‘man riding’ equipment, such as

baskets, fall arresters and man riding winches;

x

All lifting devices and equipment

shall

be inspected visually prior to use.

Version 04. Original date: 28/06/2012. Version date: 31/12/2014. Valid version only on QMS site. Uncontrolled document when printed.

Procedure prepared by: BOS Operations Department Project Manager. Approved by: BOS Head of Operations. Validated by: BOS Quality Representative.