BOS-PRD-07.900604

4 D

escri

p

tion

4

.1

S

afet

y p

reca

u

tions d

u

rin

g

liftin

g

and

h

oistin

g

o

p

erations

The lifting and hoisting operations on any ship are potentially dangerous. The lifting and hoisting operations

shall

be subject to full pre-job planning Job Safety Analysis (JSA) before commencing, giving full

consideration to the effects of weather, using of equipment and vessel movement.

4

.

2 U

se of vessel cranes

Applies to operations using specialised shipboard cranes, which are those used for the purposes other than

movement of gangways and ships stores.

x

Crane operations

shall

only be performed by authorisation of the

Master

or delegated person on the

vessel; this requirement also applies to Ships stores and Gangway cranes.

x

Only trained personnel

shall

be authorised to use specialised shipboard crane;

x

Newly assigned

C

rane

Op

erators

shall

undertake a familiarisation of the onboard crane equipment

before operating the crane;

x

Lifting operations

shall

be stopped whenever weather conditions make it potentially hazardous or

unsafe to continue operation;

x

The vessel crane shall be used for any offshore operations only if it is certified.

x

Only certified slings, ropes, chains and similar lifting equipment

shall

be used;

x

All lifting equipment

shall

be carefully and fully inspected prior to use;

x

Damaged slings, straps or similar lifting equipment

shall

be taken out of service immediately and

permanently destroyed;

x

A designated

Banks-Man

shall

be used to supervise onboard crane operations and to give signal

directions to the

C

rane

Op

erator

;

x

The

Banks-Man

shall

be clearly identifiable, but use of high visibility jacket or similar and

shall

remain within a designated safe area in compliance with the Clear Deck Policy;

x

All personnel, whether involved in the crane operations or not,

shall

stay well clear of the area of

operations;

x

Access ways that may come under operating crane paths are to be cordoned off and all personnel

warned accordingly;

x

If there is any doubt whether the weight of any item to be lifted by the crane is within the crane’s safe

working load or not, stop the operation immediately;

4

.

2

.1

C

rane o

p

erations – trainin

g

role

x

Only the

Master

, following a review of the required Operators’ License, can authorise new personnel

as

C

rane

Op

erators

;

x

All new assigned

C

rane

Op

erator

s

shall

operate the crane for a period of familiarisation under none

working conditions and

shall

be authorised for operations only when a full competence assessment

has been performed and verified;

x

Other crewmembers may operate the crane for training purposes only, but always under close

supervision of a licensed and experienced

C

rane

Op

erator

;

x

All training

shall

be approved by the

Master

or

Ch

ief

O

fficer

and

should

at a minimum include the

following:

The Safe Working Load (SWL) of the crane;

The location and operation of the emergency stop;

The movement parameters of the crane;

Tensioning and general load operation.

Version 04. Original date: 28/06/2012. Version date: 31/12/2014. Valid version only on QMS site. Uncontrolled document when printed.

Procedure prepared by: BOS Operations Department Project Manager. Approved by: BOS Head of Operations. Validated by: BOS Quality Representative.

6 / 20