Page Background

L

iftin

g

and

H

oistin

g Op

erations

BOS-PRD-07.900604

4

.

4

.

3 T

ests and lifes

p

an of liftin

g

a

cc

essories

Slings <10m:

To be renewed after 12 ½ years of age

Shackles >SWL/WLL 12 tonnes: To be tested and inspected after 12 ½ years of age

Lifting chains, hooks, plates:

To be tested after 12 ½ years of age

x

Attestation

shall

be issued by the specialist;

x

Attestation

shall

be attached to the original certificate. If existing marks are not legible anymore, new

certificate number

shall

to be issued and new mark to be stamped in to the shackle.

4

.

4

.

4 M

odifi

c

ation of liftin

g

eq

u

i

p

m

ent

x

Modification of lashing and lifting equipment such as shortage/rejected/for replacement etc.

shall

be

administrated on board and reported to the Company;

x

Original certificates of rejected equipment

shall

be marked as such and have to be attached to the

modification form.

4

.

4

.

5 C

ertifi

c

ates and attestations of liftin

g

eq

u

i

p

m

ent

x

All original Certificates of lifting and lashing equipment

shall

to be onboard. A copy of these

certificates

shall

be kept in the Managers office;

x

Attestations of re-tested lifting equipment

shall

be attached to the original certificates. A copy of the

attestation

shall

be in the office;

x

Non-ship-related beams (“roving equipment”)

shall

be delivered to the vessel with the original

certificate. In case the beam is left behind (onshore), the

M

aster

shall

send the original certificate

directly to the office.

4

.

4

.

6 M

arkin

g

of liftin

g

eq

u

i

p

m

ent

x

All “Loose lifting equipment under the hook” and auxiliary constructions (load spreaders; special

seafast. etc.)

shall

be clearly marked with an unique identification number;

x

For all lifting grommets, slings and shackles this identification number is the certificate number;

x

For all other lifting equipment (spreaders; lifting beams; polyester belts; triangle-plates; etc.) this

unique identification number, exists of the equipment number;

x

For all auxiliary constructions, as far as applicable (load spreaders; etc.) this unique identification

number, exists of the equipment number;

x

6 monthly inspection of lifting equipment

shall

be made visible by colour coding.

x

Color coding

shall

follow the following rules:

- If the charterer is providing a color-coding, the vessel shall follow the charterer color code.

- If there is no color code defined by vessel charter, the following color code shall be applied.

Every 1

st

semester of pair Year (2016-S1, 2018-S1…):

ORANGE

Every 2

nd

semester of pair Year (2016-S2, 2018-S2…)

GREEN

Every 1

st

semester of impair year (2015-S1, 2017-S1…): WHITE

Every 2

nd

semester of impair year (2015-S2, 2017-S2...):

BLUE

4

.

4

.

7 M

an ridin

g b

asket

x

Man riding basket includes basket and 4 leg sling. It

shall

be inspected by the

C

hief

O

ffi

c

er

every 3

months;

x

The inspection includes: markings good visible, construction lifting equipment and documentation.

Detailed inspection instruction is connected to the job in Star;

x

An annual survey

shall

be conducted by Class society.

Version 04. Original date: 28/06/2012. Version date: 31/12/2014. Valid version only on QMS site. Uncontrolled document when printed.

Procedure prepared by: BOS Operations Department Project Manager. Approved by: BOS Head of Operations. Validated by: BOS Quality Representative.