R

eliabilit

y

and Maintenance

P

rocedure

BOS-PRD-2601.900401

The vessels’ components that in the event of a sudden operational failure may potentially result in a partial or

complete loss of hire (cash flow consequences).

U

P

M

P

UnPlanned Maintenance Period.

BB

S

Bourbon Black Sea.

Li

f

e

Cy

cle

BOURBON Maintenance Engineering Department (integrated into Bourbon Black Sea).

MDM

Master Data Management – Department in charge of updating Task Assistant

TM

vessels databases with

information issued by Life Cycle Department.

8 R

e

v

ie

w,

a

pp

ro

v

al

,

re

v

ision and identi

f

ication o

f

c

h

an

g

es

R

e

v

ie

w

ed b

y

(j

ob title

)

App

ro

v

ed b

y

(j

ob title

)

Validated b

y

R

e

v

ision

(

Nº and date

)

Ch

an

g

es

(

c

h

a

p

ter

/

re

f

erence

)

BOS Technical

Manager

BOS Technical

Manager

BOS Quality

Representative

rev. 01 – 11/03/2013

Reviewed § 3; § 4,3; § 4.4;

§ 4.5; § 4.6; § 4.9; § 4.10;

§ 4.11; § 4.15 and § 4.16.

BOS Technical

Manager

BOS Technical

Manager

ver 03- 03/12/2013

Reviewed of § 4.2, § 4.5, § 4.11,

§ 4.15, § 4.17 and § 4.18.

BOS Technical

Manager

BOS Technical

Manager

Ver.04 – 31/12/2014

Change done in all the

procedure.

Version CR(BOS-PRD-10.900401). Original date: 28/05/2012. Version date: 31/12/2014.Valid version only on QMS site. Uncontrolled document when printed

Procedure prepared by: BOS Technical Manager. Approved by: BOS Technical Manager. Validated by: BOS Quality Representative.