eliabilit

y

and Maintenance

P

rocedure

BOS-PRD-2601.900401

4.1

8P

lanned Maintenance

P

eriod

m

ana

g

e

m

ent

Planned Maintenance Period (PMP) is to be understood as a period during which the vessel is immobilized

to perform scheduled and corrective maintenance in accordance with Class Society requirements and

maintenance schedule included in CMMS.

This period is scheduled upon Class Society bottom survey due period (annual for High Speed Crafts

registered vessels and at intermediate or renewal survey for other vessels), requiring the vessel to be

docked within this time frame. Classification Surveys intervals overview is detailed in Section § 4.19.2.

Planned Maintenance Period management is detailed in the procedure

BOS-PRD-10.0001 Planned

Maintenance Period Management Procedure.

Version CR(BOS-PRD-10.900401). Original date: 28/05/2012. Version date: 31/12/2014.Valid version only on QMS site. Uncontrolled document when printed

Procedure prepared by: BOS Technical Manager. Approved by: BOS Technical Manager. Validated by: BOS Quality Representative.

16 / 21