R

eliabilit

y

and Maintenance

P

rocedure

BOS-PRD-2601.900401

x

BOS-FRM-10 0024 - Task Assistant Fleet KPI Monthly Follow Up.

x

BOS-FRM-10.0022 – Sub-Contractor Equipment Inspection Report.

x

BOS-PRD-2602.0001 – Purchasing and Supply Chain Procedure.

x

Task Assistant user Manual.

x

B-PRD-10.0002 – Task Assistant maintenance Procedure.

x

B-GDL-10.0008 - Processing Tickets in Master Data Management Ticketing System Guidelines.

x

B-GDL-10.0009 - Vessel Equipment Change Guidelines.

x

B-FRM-10.0009 – Equipment Change Report.

x

B-GDL-2601.0004 - Task Assistant™ Use Key Performance Indicators Guidelines.

x

B-GDL-2601.0005 - 4A and 4B Key Performance Indicators Guidelines.

7

Ter

m

s and definitions

C

o

C

Conditions Of Class.

C

riticalit

y

(

of e

q

uip

m

ent

)

“The sudden operational failure of which may result in hazardous situations” and is therefore specific to

vessel type and design.

C

MM

S

Computerised Maintenance Management System.

D

P

Dynamic Positioning.

Fi-Fi

Fire Fighting.

FMEA

Failure Mode Effect Analysis.

J

S

A

Job Safety Analysis.

K

PI

Key Performance Indicator.

M

PS

V

Multi-Purpose Supply Vessel.

OOW

Officer of the Watch.

P

M

S

Planned Maintenance System.

P

M

P

Planned Maintenance Period.

P

TW

Permit To Work.

S

ho

w S

topper

Version CR(BOS-PRD-10.900401). Original date: 28/05/2012. Version date: 31/12/2014.Valid version only on QMS site. Uncontrolled document when printed

Procedure prepared by: BOS Technical Manager. Approved by: BOS Technical Manager. Validated by: BOS Quality Representative.

21 / 21