Table of Contents Table of Contents
Previous Page  161-Reliability and Maintenance Procedure / 748 Next Page
Information
Show Menu
Previous Page 161-Reliability and Maintenance Procedure / 748 Next Page
Page Background

R

eliabilit

y

and Maintenance

P

rocedure

BOS-PRD-2601.900401

5 R

ecords

x

Technical Downtime Daily Reports;

x

Technical Downtime Final Report;

x

Bridge Logbook;

x

Engine Room Logbook;

x

Maintenance International Weekly Report mail;

x

Task Assistant

TM

software;

x

Task Assistant Fleet KPI Monthly Follow Up;

x

Defect Report (for non TA vessels);

x

BOS OPS Action Plans (for non TA vessels);

x

CMMS in excel file (for non TA vessels);

x

Task assistant performance reviews (

IN DRAFT

);

x

Task Assistant training records;

x

Task Assistant Monthly Report KPIs;

x

Task Assistant Training feedback forms;

x

Equipment Change Report;

x

Technical Planning Survey;

x

Vessel Technical Survey Report;

x

Investigation report and incident analysis.

x

New built vessels standard Warranty Claim List

(IN DRAFT);

x

Sub-Contractor Equipment Inspection Report.

6 R

elated docu

m

ents

x

B-GDL-03.0007 – OSM Guidelines.

x

B-PRS-10 – Maintenance and Reliability Process.

x

B-POL-01.0018 – Maintenance Policy.

x

B-CHR-10.0001 – BOURBON Maintenance Organization.

x

B-GDL-10.0003 – Maintenance and Reliability Process Management Guidelines.

x

B-GDL-2601.0002 – Technical Downtime Guidelines.

x

B-GDL-10.0005 - Budget Overrun Request Guidelines.

x

B-GDL-10.0006 – Maintenance Release Guidelines.

x

B-GDL-10.0007 – Maintenance Feedback Process Guidelines.

x

B-GDL-2601.0001 - Maintenance Reporting Guidelines.

x

B-GDL-2601.0002 - Technical Downtime Guidelines.

x

Service Level Agreement Bourbon Black Sea.

x

Maintenance Alerts, Bulletins & Instructions.

x

B-MI-2013-002 – Bourbon Maintenance Process Abbreviations.

x

GAIA-INS-10.0100 - Subsea Wire Rope Maintenance Instruction.

x

B-FRM-10.0008 – Technical Downtime Daily Report.

x

B-FRM-2601.0001 - Technical Downtime Final Report.

x

BOURBON Standard Warranty Claim List (in DRAFT – only applicabe to new built vessels during

warranty period).

x

BOS-PLN-01.2015 – BOS Plan 2015

(in Draft).

x

Classification Societies websites (BV, DNV, ABS).

x

BOS-PRD-10.900402 – Planned Maintenance Period Management Procedure.

x

BOS-PRD- 2601.XXXX – Hull and Machinery Insurance Claim Management

(in Draft)

.

x

BOS-INS-10.0003 - Vessels allocation by superintendent.

x

BOS-FRM-10.0008 - Defect Report.

x

BOS-FRM-10 0010 - Technical Planning Survey.

x

BOS-FRM-10.0001 – Vessel Technical Survey Report.

Version CR(BOS-PRD-10.900401). Original date: 28/05/2012. Version date: 31/12/2014.Valid version only on QMS site. Uncontrolled document when printed

Procedure prepared by: BOS Technical Manager. Approved by: BOS Technical Manager. Validated by: BOS Quality Representative.

21 / 21

161