BOS-PRD-2601.900402

Version CR(BOS-PRD-10.900402) . Original date: 28/05/2012. Version date: 31/12/2014. Valid version only on QMS site. Uncontrolled document when printed.

Procedure prepared by: BOS Technical Manager. Approved by: BOS Technical Manager. Validated by: BOS Quality Representative.

7 / 18

Bour

b

on Dockin

g

Warranty O

ff

icer

has the responsibility, authority and accountability for:

a

)

Managing warranty claims after Planned Maintenance Period in collaboration with

Technical

S

uperintendent

.

Ma

s

ter

of the vessel has the responsibility, authority and accountability for:

a) Ensuring, during preparation stage, a review of all vessel equipments condition and operation, and

issuing a worklist accordingly, including preventive jobs, repairs, and improvements;

b) Ensuring, during preparation stage, that purchasing requisitions for parts, services and supplies

necessary to achieve the work list are issued in due time;

c) Ensuring, during Planned Maintenance Period at the worksite, that the job specification and details

are known by all the crew and that each crew member has understood its rule and responsibility

during the Planned Maintenance Period;

d) Managing, during Planned Maintenance Period at the worksite and in collaboration with

Bour

b

on

Dockin

g

S

uperintendent

, safety on board as per Company and Shipyard standards and

procedures;

e) Assisting, during Planned Maintenance Period at the worksite,

Bour

b

on Dockin

g

S

uperintendent

,

especially ensuring that vessel and equipment are configured to allow for job achievement as per

specification;

f) Reporting, during Planned Maintenance Period at the worksite, to the

Technical

S

uperintendent

the job progress as well as any Safety or Quality issue;

g) Ensuring that any plant or equipment maintained or repaired during the Planned Maintenance Period

is tested until found up to nominal parameters and that tests are properly recorded;

h) Ensuring, at the end of the Planned Maintenance Period at worksite, that the vessel (Topsides, Main

Deck, Accomodation, Engine room and tank farm) painting, tyding up and cleanliness are up to

standards, i.e. that the vessel is fit for chartering. Some painting and housekeeping jobs could be

done after vessel departure from shipyard only if those are completed prior to arrival at chartering

location;

i) Endorsing, at the end of the Planned Maintenance Period at worksite and for Planned Maintenance

Period delegated to Bourbon Docking, the Redelivery protocol on behalf of

Technical

S

uperintendent

;

j) Ensuring, upon completion of the Planned Maintenance Period, that information gathered in the final

report are properly recorded in the Computerised Maintenance Management System in use on board

the vessel (Task Assistant

TM

if applicable or excel file);

k) Updating, upon completion of the Planned Maintenance Period, Vessel Filing System, other related

documentation and inventories;

l) Raising warranty claim to the

Technical

S

uperintendent

when applicable.

C

hie

f

En

g

ineer

of the vessel has the responsibility, authority and accountability for:

a) Reviewing, during preparation stage and according to

Ma

s

ter

’s instructions

, vessel equipments

condition and operation, and issuing a worklist accordingly, including preventive jobs, repairs, and

improvements.

b) Issuing, during preparation stage and according to

Ma

s

ter

’s instructions

, purchasing requisitions for

parts, services and supplies necessary to achieve the work list;

c) Ensuring, during Planned Maintenance Period at the worksite, that the job specification and details

are known by engine team and that each team member has understood its rule and responsibility

during the Planned Maintenance Period;

d) Assisting, during Planned Maintenance Period at the worksite,

Ma

s

ter

and

Technical

S

uperintendent

in the management of the safety on board as per Company and Shipyard standards

and procedures;

e) Assisting, during Planned Maintenance Period at the worksite, the

Bour

b

on Dockin

g

S

uperintendent

, especially ensuring that vessel and equipment are configured to allow for job

achievement as per specification.