lanned Maintenance

P

eriod

Mana

g

e

m

ent

P

rocedure

BOS-PRD-2601.900402

Version CR(BOS-PRD-10.900402) . Original date: 28/05/2012. Version date: 31/12/2014. Valid version only on QMS site. Uncontrolled document when printed.

Procedure prepared by: BOS Technical Manager. Approved by: BOS Technical Manager. Validated by: BOS Quality Representative.

12 / 18

Nota 1 : See section 4.5 for worklist preparation instructions.

Nota 2 : Parts and supplies requisitions shall be done according to instruction

“

B-MI -2013-004 - PR creation

for PMP

”

i

n Task Assistant.

Nota 3

: Approved Specification must be ‘

frozen’

in Refman in order to:

ƒ

Trace supplementary jobs (flagged as such with a ‘S’ on job number’

);

ƒ

Trace additional delays and costs;

ƒ

Issue reporting on supplementary jobs.

4.

2

S

a

f

et

y

Mana

g

e

m

ent durin

g P

M

P

at

w

or

ks

ite

Procedures contained in

Section 9 of SMS Manual

shall

be applied during dry dock unless a bridging

document is issued and signed between Bourbon Offshore Surf and a Third Party Company (Bourbon

Docking or Shipyard for PMP not delegated to Bourbon Docking).

4.

3

P

M

P P

roject Mana

g

e

m

ent tool

s

As shown on workflows in section 4.1, the following tools

shall

be used for Planned Maintenance Period

project management:

x

Task Assistant

TM

- Computerised Maintenance Management System software used during Planned

Maintenance Period preparation stage to identify and document preventive and corrective jobs,

prepare and issue purchasing requisitions for parts, services and supplies. Upon Planned

Maintenance Period completion, final report information

shall

be recorded into Task Assistant

TM

by

vessel crew;

x

“

PMP Specific SOW Preparation form

”

(only for vessels where Task Assistant

TM

is not implemented)

–

As per instruction

“

B-MI-2013-28 - PMP Specific SOW Preparation”

, this form is an excel file which

sheets refer to REFMAN

TM

PMP specification table of content. Additional sheets in the document

shall

be created (copying and paste + numbering accordingly the initial one) while more than one job

is related to the same section of the specification.

x

Oracle

TM

–

Enterprise Ressources Planning (ERP) used for Planned Maintenance Period purchasing

requisitions processing and shipment follow up;

x

Refman

TM

–

Software used for Planned Maintenance Period specification drafting and issuance,

shipyard bidding and selection, costs record and follow up as well as final technical and cost reports

drafting and issuance;

x

Docsea

TM

Stock

–

Software used on vessel where Task Assistant

TM

is not implemented, to issue

purchasing requisitions for parts, services and supplies;

4.4

P

M

P P

roject delivera

b

le

s

Depending on the Planned Maintenance Period stage, the following deliverables shall be issued:

x

Preparation

o

PMP specification including BOURBON terms and conditions, ship particulars, job details

and requirements;

o

PMP budget forecast including shipyard quote and validated purchased orders amount;

o

“

Budget Overrun Request

”

as applicable.

x

Worksite follow up and achievement:

o

“

Repair Contract

”

;

o

“

Technical Downtime Daily Report

”

;

o

“

Weekly Cost Report

”

;

o

“

Jobs Time summary

”

(Refman format);

x

Reporting upon completion:

o

“

Final Technical Report

”

;

o

“

Final Cost Report

”

;

o

“

Equipment Change Report

”

as applicable;

o

“

Standard Warranty Claim List

”

as applicable;