lanned Maintenance

P

eriod

Mana

g

e

m

ent

P

rocedure

BOS-PRD-2601.900402

Version CR(BOS-PRD-10.900402) . Original date: 28/05/2012. Version date: 31/12/2014. Valid version only on QMS site. Uncontrolled document when printed.

Procedure prepared by: BOS Technical Manager. Approved by: BOS Technical Manager. Validated by: BOS Quality Representative.

13 / 18

4.

5

In

s

truction

s

f

or

w

or

k

li

s

t

p

re

p

aration

In order to document properly the Planned Maintenance Period specification,

Ma

s

ter

and

C

hie

f

En

g

ineer

shall

ensure that relevant information are detailed for each job of the worklist. The following lists, splitted by

type of job,

shall

be used as guidelines to document job details:

x

Mechanical jobs:

o

Pictures showing the complete equipment and parts/subassemblies included in the job;

o

References of related equipment documentation (maintenance manual, user’s manual,…). If

available in electronic format, documentation

should

be copied to a dedicated folder and

sent to the shipyard;

o

References of

all useful plans (general arrangements, detailed drawings with dimensions…)

;

o

Log sheet with manufacturer’s tolerances

.

x

Metal & Boiler maker jobs:

o

Pictures showing the complete equipment and parts/subassemblies included in the job;

o

References of all relevant plans and drawings (general arrangements, capacity plans,

detailed drawings with dimensions

…);

o

Details on dimensions (length, width, diameter) and materia

l (grade, scantling,…)

;

o

Sketches and/or schematic diagrams of the plate to be replaced and its location on ship

structure. A freehand drawing on a scanned sheet of paper is sufficient.

x

Piping jobs:

o

Pictures showing the complete equipment and parts/subassemblies included in the job;

o

References of all relevant plans and drawings (general arrangements, capacity plans, piping

layout, detailed drawings with dimension

s…);

o

Outside pipe diameter, length, number and types of bends (90° / 135° / ...);

o

Number and type of flanges (outer diameter/number of holes and hole spacing);

o

Type of fluid and nominal pressure;

o

Piping material and grade;

o

Indicate if bolt replacement is required and, if so, who will provide them (ship or shipyard).