Table of Contents Table of Contents
Previous Page  156-Reliability and Maintenance Procedure / 748 Next Page
Information
Show Menu
Previous Page 156-Reliability and Maintenance Procedure / 748 Next Page
Page Background

R

eliabilit

y

and Maintenance

P

rocedure

BOS-PRD-2601.900401

Records of each technical inspection

shall

be maintained on permanent file within the Technical Department

and onboard each vessel as applicable.

The inspection

shall

include critical equipment.

Inspection scheduling and monitoring

should

be measured and managed under the

Technical Manager’

s

KPI’s which

shall

be incorporated into the technical reporting required for the Quarterly Management Review

meeting.

The standard form

BOS-FRM-10.0001 – Vessel Technical Survey Report

is used for this purpose. This form

include instructions for the management of the recommendations noted in the report.

Upon reception of the validated report,

Ma

s

ter

and

C

hie

f

Engineer

shall

record recommendation in Task

Assistant

TM

or Operation Action Plan (for vessels not fitted withTask Assistant

TM

software), take all necessary

actions and update records upon actions completion.

4.1

6

In

sp

ection o

f

cargo tan

ks,

balla

s

t tan

ks

and void

sp

ace

s

The vessel inspection program

shall

include routine inspection of vessels hull integrity including inspection of

integral tanks and void spaces.

Where possible this inspection routine

should

be incorporated into the vessel CMMS and managed as part of

the Preventive Maintenance program.

Records of SPECIFIC tank inspections

shall

be maintained in a standard format (in CMMS) , and

shall

include use of photographs’ as evidence to the specific tank’s condition.

Version CR(BOS-PRD-10.900401). Original date: 28/05/2012. Version date: 31/12/2014.Valid version only on QMS site. Uncontrolled document when printed

Procedure prepared by: BOS Technical Manager. Approved by: BOS Technical Manager. Validated by: BOS Quality Representative.

14 / 21

156