er

m

it to

W

or

k

BOS-PRD-03.900902

x

Check that all equipment, including a stretcher, is available and correct and that the SCBA set(s)

and/or any other emergency rescue breathing equipment is fully operational;

x

Ensure that first aid kits are available on scene;

x

The person being rescued may also need breathing apparatus assistance. Where it may not be

practical to provide a SCBA unit for this purpose, an EEBD (Emergency Escape Breathing Device or

Breathing Hood)

shall

provide a manageable substitute;

x

Confirm understanding of an agreed communication method;

x

When it is ascertained that all safety measures are in place, the rescue team

should

enter the

enclosed space complete with the rescue equipment and stretcher (as applicable) and recover the

casualty;

x

Once the casualty is removed from the enclosed space, make an initial examination of the casualty

and apply first aid as necessary;

x

The

C

o

n

tr

ac

t M

ana

ger

and

Oper

a

tio

ns

M

ana

ger

and any applicable

O

ffs

hore

Ins

t

a

ll

a

tio

n

M

ana

ger

(OIM)

shall

be informed at the earliest opportunity with regard to the situation;

x

If necessary, implement procedures to transfer the casualty to an installation or ashore for further

professional medical treatment;

x

A record of the situation

shall

be kept in the vessel’s Logbooks as applicable;

x

All stages of a simulated enclosed space emergency rescue

shall

be practised during drills. This

includes actual entry with all pre-task safety checks, equipment and personnel suitability completed.

4.

9 H

ot

w

or

k

A PTW is required for all hot works wherever the location

(PTW # 1, BOS-FRM-03.0018)

.

The applicable Hot Work documentation identifies the safety measures necessary for any job that is

classified as “hot work” involving sparks, heat, or open flames.

Hot work is defined as:

x

Welding;

x

Grinding with abrasive wheels and brushes (outside workshops);

x

Burning using oxygen and acetylene torches;

x

Burning using carbon rods.

P

re

cau

tio

ns &

A

wa

re

n

e

ss

Fuel/Diesel tanks

shall

have all residue removed and be properly washed out to remove the likelihood of gas

pockets prior to performing any hot-work:

x

Ignition can be caused by heat, sparks and droplets of molten metal, by heat conduction, the

accumulation of heat and by ignition of flammable gas. Burn injuries are also a potential risk of hot

work;

x

All relevant authorisations are given and applicable personnel properly informed before

commencing;

x

Stop all bunkering, fuel transfer, or handling of any inflammable materials in the vicinity;

x

Check that all hot work equipment is in good condition and that flashback arrestors are fitted in

place;

x

Carefully check for possible defects (proper voltage, condition of valves, gauges torches, hoses and

all related equipment);

x

Remove, protect or cover with fireproof material any combustible or flammable material or equipment

located in the immediate vicinity and in all adjacent and nearby compartments;

x

Clear any flammable or combustible material from the pathway of any duct being worked upon;

x

Ensure adequate ventilation and sufficient lighting is present and maintained throughout the task;

x

If work is to be carried out on a storage or drainage tank, be sure that the tank is empty, gas free if

applicable and that the tank remains shut during the work;

x

Always determine the risk of explosion in enclosed or confined spaces (% LEL);

x

Check that fire alarm systems in the area are functioning and that there is sufficient fire fighting

equipment readily available, including a water source ready to douse or cool;

x

Ensure that any extinguishers are suited to the type of materials surrounding the work site and the

type of hot work equipment;

Version 04. Original date: 25/05/2012. Version date: 31/12/2014. Valid version only on QMS site. Uncontrolled document when printed.

Procedure prepared by: BOS QHSES Coordinator. Approved by: BOS QHSES Manager. Validated by: BOS Quality Representative.

10 / 17