Previous Page  530-Permit To Work / 748 Next Page
Information
Show Menu
Previous Page 530-Permit To Work / 748 Next Page
Page Background

P

er

m

it to

W

or

k

BOS-PRD-03.900902

4.

2 P

er

m

it

s

to

W

or

k

i

n

sh

i

pya

r

d

s

an

d d

r

y

d

o

c

ks

Te

c

hn

i

c

a

l

Sup

eri

n

te

n

d

e

n

t

, in conjunction with the

M

as

ter

,

shall

establish responsibilities with the shipyard

management for the safety of the vessel, the crew and the environment prior to the vessel’s arrival:

x

These responsibilities

shall

be documented in a

Bridging Document

which

shall

be signed by the

shipyard, the

Te

c

hn

i

c

a

l

Sup

eri

n

te

n

d

e

n

t

and the

M

as

ter

(following arrival and subsequent review);

x

The Company PTW system

shall

be used for all work involving Company personnel or assets as

agreed in the bridging document;

x

Ship yard/dry dock employees have the responsibility to use their PTW system as agreed in the

bridging document

and

shall

maintain the highest safety standards whenever working on or with

Company vessels or other assets;

x

Safety watches

shall

be scheduled to ensure proper and full compliance with the watch keeping and

safety requirements.

4.

3 P

er

m

it

s

to

W

or

k w

it

h

i

n

t

h

e

500 m

etre

s z

o

n

e

x

A PTW required while a vessel is operating within the 500m zone

shall

require the approval of the

O

ffsh

ore

Ins

t

a

ll

a

tio

n

M

ana

ger

(

O

I

M

)

for hot work job on the deck

;

x

A PTW is automatically suspended in the event of any emergency situation arising on the vessel or

installation;

x

Before recommencing work where a PTW has been suspended, the conditions of the PTW

shall

be

re-assessed and approved by the

T

ask

Sup

ervi

s

or

before re-commencing work. In addition,

approval to recommence

shall

be granted by the

O

I

M

.

4.4 M

u

lti

p

le

p

er

m

it re

qu

ire

m

e

n

t

s

Examples of more than single PTW requirements:

x

An enclosed space entry PTW has been obtained to enter and inspect a bilge tank. It is then found

that there is a need to perform hot work at the location. A hot work permit

shall

also be obtained

before continuing;

x

An electrical PTW has been obtained. In the course of the task, it becomes necessary to work at

heights. A working aloft PTW

shall

be obtained before continuing.

4.

5

Tr

a

i

n

i

n

g

R

e

qu

ire

m

e

n

t

s

i

n

haza

r

d

i

d

e

n

ti

f

i

c

a

tio

n

an

d

ri

sk

ass

e

ssm

e

n

t

The Company

shall

ensure relevant crew members (all officers as a minimum) receive appropriate training in

hazard identification and risk assessment, in order to apply the Permit To Work system and ‘High Risk

Tasks’ procedures. Such training can be performed onboard or ashore (as appropriate) with records

maintained in vessel files or/and employee personnel files.

Training

shall

specifically emphasise the role and responsibility of the PTW

T

ask

Sup

ervi

s

or

and the

mitigation of hazards associated with ‘High Risk Tasks’ as outlined in this procedure.

4.

6 P

T

W

au

d

it

p

ro

c

e

ss (Day-

to

-

d

ay bas

i

s)

Vessel

M

as

ter

shall

ensure that this procedure is well implemented and maintained onboard the vessel

under his/her command by auditing in a daily basis all PTW issued on board.

During this audit

M

as

ter

has to check PTW form is well completed,

M

as

ter

has to check

TBT log book

information to ensure that PTW completed are corresponding to the work that has been undertaken.

Audit process

shall

also cover a Permit to work under progress to ensure that all measures are correctly put

in place by workers (LogoutTag out procedure put in place, appropriate PPE are worn by workers…).

Version 04. Original date: 25/05/2012. Version date: 31/12/2014. Valid version only on QMS site. Uncontrolled document when printed.

Procedure prepared by: BOS QHSES Coordinator. Approved by: BOS QHSES Manager. Validated by: BOS Quality Representative.

6 / 17