Lock-Out/Tag-Out

shall

be followed as required to prevent persons operating any machinery or

equipment that may inadvertently cause injury to the person working at height. This includes the

vessel’s whistle/horn;

x

If work aloft is in the vicinity of funnels or other exhaust areas, the duty Engineer

shall

be informed

and the associated machinery shut down and locked/tagged out;

x

The work

shall

remain under observation and all applicable personnel

shall

be informed regarding

the work being undertaken;

x

An approved type safety harness with a suitable lifeline or other arresting device

shall

be worn. The

harness

shall

have at least two arrest lines;

x

Suitable anchor points for use with safety harnesses

shall

be identified and communicated prior to

any work aloft commencing;

x

The worker

shall

be secured to at least one anchor point at all times while aloft. This requirement is

applicable while climbing, working, descending or changing positions aloft;

x

Anchor points for using with the safety harness

shall

be such that the potential fall distance does not

exceed 0,5 meters;

x

Tools and equipment used in the task

shall

be maintained and fully inspected prior to work

beginning;

x

Tools and equipment

shall

be in good, clean condition and

shall

be secured in a suitable bag/belt or

have lanyards attached;

x

Drop lines

shall

be provided when necessary to pass tools to and from the work site aloft;

x

All relevant personnel are informed of the PTW and work in progress.

4.11

W

or

k

i

n

g

over

-s

i

d

e

/

o

u

t

b

o

a

r

d

A PTW is required for any work over-side/outboard

(PTW # 3 Working Aloft and Over Side, BOS-FRM-

03.0019)

, to ensure the safety of personnel working outboard of the vessel using staging, pilot

ladders/scaffolding or other temporary platform.

Working over-side/outboard on the vessel involves any work when persons are engaged to perform any work

on the outboard sides of the vessel’s hull and is considered as Working Aloft.

The appropriate Working at Height documentation identifies the safety measures necessary.

Hazards involved with this type of work include, but are not limited to:

x

Falling into the water or onto the quayside;

x

Being doused by overboard discharges;

x

Risk of being struck by objects thrown or falling from the vessel or quayside.

P

re

cau

tio

ns &

A

wa

re

n

e

ss

x

The vessel

shall not

be making way and

shall

ideally be secured alongside, anchored or similarly

made fast;

x

Identification and use of the correct PPE;

x

The work

shall

remain under observation and all applicable personnel

shall

be informed regarding

the work being undertaken;

x

An approved type safety harness with a suitable lifeline or other arresting device

shall

be worn. The

harness

shall

have at least two arrest lines;

x

Suitable anchor points for use with safety harnesses

shall

be identified and communicated prior to

any work aloft commencing;

x

The worker

shall

be secured to at least one anchor point at all times while aloft. This requirement is

applicable while climbing, working, descending or changing positions aloft;

x

Anchor points for using with the safety harness

shall

be such that the potential fall distance does not

exceed 0,5 meters;

x

Approved type flotation aids (work-vest/life-jacket)

shall

be worn by all persons working over-side

and any persons that are working or assisting in such a position that a fall may result in water entry;

x

Tools and equipment used in the task

shall

be inspected prior to work beginning and

shall

be in

good, clean condition and

shall

be secured in a suitable bag/belt or have lanyards attached;

x

Drop lines

shall

be provided when necessary to pass tools to and from the work site over-

side/outboard;

Version 04. Original date: 25/05/2012. Version date: 31/12/2014. Valid version only on QMS site. Uncontrolled document when printed.

Procedure prepared by: BOS QHSES Coordinator. Approved by: BOS QHSES Manager. Validated by: BOS Quality Representative.

12 / 17

536