Table of Contents Table of Contents
Previous Page  453-Helicopter Winching/Hoisting Operations Procedure / 748 Next Page
Information
Show Menu
Previous Page 453-Helicopter Winching/Hoisting Operations Procedure / 748 Next Page
Page Background

H

elico

p

ter

W

inc

h

in

g/H

oistin

g Op

erations

BOS-PRD-07.900611

The following safety precautions are compulsory during all transfer operations:

1) Deck team

should

never stand beneath the helicopter rotors without express instruction from the

Ch

ie

f Off

icer

.

2) Deck team

should

ground the hoist cable using the static discharge grounding rod.

3) Personnel

should

be constantly mindful of the dangers caused by the suspended sling and payload

especially when vessel movement is significant.

4) AB

should

approach the payload only when instructed to do so by the

Ch

ie

f Off

icer

and

should

stay

in proximity no longer than necessary.

5) Deck team

should

withdraw from the hoisting zone as soon as the payload has been attached and

the OK hand signal has been given to the helicopter crew.

5

.

R

ecords

x

JSA/TBT.

x

Log entries.

6

.

R

elated docu

m

ents

x

ICAO Technical Instructions for the Safe Carriage of Dangerous Goods by Air.

x

The Offshore Installations and Pipeline Works (Management and Administration) Regulations SI 1995

No. 738.

x

Civil Aviation Acts 1949 to 1982.

x

Aviation Security Act 1982.

x

The Air Navigation (Dangerous Goods) Regulations 1985, SI 1985/1939 as amended under the Air

Navigation Order 1970.

x

Documents and publications similar to the above issued by the National Authority of the territory in which

the Vessel is operating.

x

CAA CAP 437.

x

HSE Offshore Design Guidelines.

x

BOS-PNL-0301.0002 – SOLAS Training Manual.

x

BOS-FRM-0301.0001 – SOLAS Training Manual – Vessel Specificities.

x

BOS-FRM-03.0069 – G-JSA 17 -Helicopter Winching.

7

. Ter

m

s and de

f

initions

S

tatic Disc

h

ar

g

e

R

od

The Static Discharge Rod is designed to safely remove the static charge after de-energizing.

8

.

R

e

v

ie

w,

a

pp

ro

v

al

,

re

v

ision and identi

f

ication o

f

c

h

an

g

es

R

e

v

ie

w

ed

by

(j

o

b

title

)

App

ro

v

ed

by

(j

o

b

title

)

Validated

by

Version

(

Nº and date

)

Ch

an

g

es

(

c

h

a

p

ter

/

re

f

erence

)

BOS Operations

Dpt Project

Coordinator

BOS

Head

of

Operations

BOS Quality

Representative

Ver.01 – 08/08/2014

Original version.

Version 01. Original date: 08/08/2014. Version date: N/A. Valid version only on QMS site. Uncontrolled document when printed

Procedure prepared by: BOS Ops Dpt Project Coordinator. Approved by: BOS Operations Department Director. Validated by: BOS Quality Representative.

9 / 9

453