H
elico
p
ter
W
inc
h
in
g/H
oistin
g Op
erations
BOS-PRD-07.900611
The following safety precautions are compulsory during all transfer operations:
1) Deck team
should
never stand beneath the helicopter rotors without express instruction from the
Ch
ie
f Off
icer
.
2) Deck team
should
ground the hoist cable using the static discharge grounding rod.
3) Personnel
should
be constantly mindful of the dangers caused by the suspended sling and payload
especially when vessel movement is significant.
4) AB
should
approach the payload only when instructed to do so by the
Ch
ie
f Off
icer
and
should
stay
in proximity no longer than necessary.
5) Deck team
should
withdraw from the hoisting zone as soon as the payload has been attached and
the OK hand signal has been given to the helicopter crew.
5
.
R
ecords
x
JSA/TBT.
x
Log entries.
6
.
R
elated docu
m
ents
x
ICAO Technical Instructions for the Safe Carriage of Dangerous Goods by Air.
x
The Offshore Installations and Pipeline Works (Management and Administration) Regulations SI 1995
No. 738.
x
Civil Aviation Acts 1949 to 1982.
x
Aviation Security Act 1982.
x
The Air Navigation (Dangerous Goods) Regulations 1985, SI 1985/1939 as amended under the Air
Navigation Order 1970.
x
Documents and publications similar to the above issued by the National Authority of the territory in which
the Vessel is operating.
x
CAA CAP 437.
x
HSE Offshore Design Guidelines.
x
BOS-PNL-0301.0002 – SOLAS Training Manual.
x
BOS-FRM-0301.0001 – SOLAS Training Manual – Vessel Specificities.
x
BOS-FRM-03.0069 – G-JSA 17 -Helicopter Winching.
7
. Ter
m
s and de
f
initions
S
tatic Disc
h
ar
g
e
R
od
The Static Discharge Rod is designed to safely remove the static charge after de-energizing.
8
.
R
e
v
ie
w,
a
pp
ro
v
al
,
re
v
ision and identi
f
ication o
f
c
h
an
g
es
R
e
v
ie
w
ed
by
(j
o
b
title
)
App
ro
v
ed
by
(j
o
b
title
)
Validated
by
Version
(
Nº and date
)
Ch
an
g
es
(
c
h
a
p
ter
/
re
f
erence
)
BOS Operations
Dpt Project
Coordinator
BOS
Head
of
Operations
BOS Quality
Representative
Ver.01 – 08/08/2014
Original version.
Version 01. Original date: 08/08/2014. Version date: N/A. Valid version only on QMS site. Uncontrolled document when printed
Procedure prepared by: BOS Ops Dpt Project Coordinator. Approved by: BOS Operations Department Director. Validated by: BOS Quality Representative.
9 / 9
453




