BOS-PRD-07.900602

4.1

2T

rans

f

er o

f

li

qu

i

d

/w

et

bu

l

k

d

rillin

g p

ro

d

u

c

ts

Only hoses that have been inspected and tested in accordance with the manufacturer’s recommendations

shall

be used. Records of inspection and test

shall

be retained by the

Master

.

For the transfer of liquid/wet bulk drilling products the tank use

shall

be defined with the charterer and

shall

not be changed without carefully cleaning the tanks before loading a different product.

Before the transfer of liquid/wet bulk drilling products tanks

shall

be carefully inspected, if possible in the

presence of the

Contra

c

ts Mana

g

er

and charterer’s representative.

A record of tank inspection

shall

be documented in the Bridge Logbook.

All piping systems shall be carefully checked by Engineer in engine room and on deck before starting

transfer

The

Master

/ Bridge

Wat

c

h

Off

i

c

er

shall

know the temperature of brine-like products before loading so as to

avoid raising the temperature in adjacent tanks (especially tanks containing diesel fuel) and to prevent

deterioration of sealing materials in loading valves.

Careful attention

shall

be given to the density factor and the effects of temperature variation.

The risk of blow out during transfer of materials

shall

be taken seriously. Hoses

shall

be handled and tested

properly.

When pumping has finished, both the receiver and provider

shall

set their lines to allow the hose to be

drained back into the vessel's tank.

If the installation has a vacuum breaker fitted to the line, this

shall

be used to aid draining. In suitable

conditions, the crane

shall

also be used to lift the hose to aid draining.

4.1

3

Wor

k

in

g

at o

ff

shore lo

c

ations

When working at an offshore location, before undertaking any cargo operation pre-job safety planning

shall

be performed.

Verify the operational status of the vessels control systems, obtain an accurate assessment of weather

conditions, and ensure that all means of communications are functional and efficient.

Whenever possible, the vessel

shall

be positioned to work in an acceptable position in relation to the

installation and the swell to minimise vessel motion.

For quick snatch operations, the

Master

/

Bri

d

g

e Wat

c

h

Off

i

c

er

shall

ensure that the vessel has stabilised

and can safely hold position before commencing loading or unloading.

In the best practices of safety and good seamanship, the

Master

/

Bri

d

g

e Wat

c

h

Off

i

c

er

shall

always try to

find the best compromise between the direction of the swell and current.

For operations involving tying up alongside an offshore installation or location, loading and unloading

shall

not

commence until the vessel has fully stabilised and the mooring arrangements have been verified as

sufficient.

At least two crew members are to be standing by in a dedicated safe area at all times during cargo

operations.

Crew members are to wear the correct Personal Protective Equipment (PPE) and maintain strict compliance

regarding the Clear Deck Policy.

Version 04. Original date: 22/06/2012. Version date: 31/12/2014. Valid version only on QMS site. Uncontrolled document when printed.

Procedure prepared by: BOS Operations Department Project Manager. Approved by: BOS Operations Manager Director. Validated by: BOS Quality Representative