During back load operations, the

Master/Bri

dg

e Wat

c

h

Off

i

c

er

shall

report any deficiencies with any cargo

item, cargo carrying unit, slings or other lifting arrangements as soon as possible to the installation

responsible person; including the

Off

shore

I

nstallation Mana

g

er

(OIM) if necessary.

Any such items

shall

be returned to the installation if it is safe to do so.

If returning the item is not practical or presents a safety hazard, the

Master

/

Bri

dg

e Wat

c

h

Off

i

c

er

shall

request equipment from the installation in order to rectify the situation onboard if this is possible.

In all such cases a log book entry is to be made detailing the incident and a brief report forwarded to the

installation

Off

shore

I

nstallation Mana

g

er

and the

Contra

c

ts Mana

g

er

accordingly.

Whenever possible, positioning metal cargo units directly onto metal deck areas

shall

be avoided. If this is

unavoidable ensure that the cargo item is very well secured against shifting and that great care is exercised

when crew are approaching the item to secure it.

Position the vessel accordingly to minimise motion when securing the cargo item.

It is preferable and safer to use tugger winches to move cargo items on deck than reposition using an

installation crane. In either case, plan the task safely and properly and exercise due caution.

4.1

5

Wor

k

in

g w

ith hoses

Hoses

S

ele

c

tion:

The hose

should

be selected according to the nature of the bulk cargo transfered. If necessary purchase

with

Planned Maintenance System

(PMS).

Hoses

I

ns

p

e

c

tion:

Weekly inspections

x

Hoses

shall

be thoroughly checked for any physical damage for chafing, cuts, blisters, splitting,

perishing, lacerations or other forms of deterioration, if there is any doubt it

shall

be replaced;

x

The condition marking and the marking of the hose coupling

shall

be checked.

x

Check hoses are protected from structure and stowed properly in hang-off points.

x

Check the lighting of the hoses storage.

x

Hose

shall

be stenciled, indicating next pressure test to be carried out: i.e NEXT PRESSURE TEST:

“DATE”.

Visual inspection pre and post use

A visual inspection

shall

be carried out prior to and after vessel operations. The following checks should be

carried out as a minimum:

x

Hoses must not show any signs of physical damage by chafing, splitting, perishing, blistering, deep

lacerations or any other forms of deterioration.

x

Check installation manifold couplings are tight and ready for operation.

Testin

g

:

All hoses

shall

be hydrostatically tested at ambient temperature to a pressure not less than 1.5 times its

specified maximum working pressure, but not 0.4 times of the bursting pressure. This test shall be performed

annually.

Retirement:

Hoses, manifolds and valves are visually inspected, maintained and replaced as required and / or in

accordance with the

planned maintenance system

.

Mar

k

in

g c

riteria:

Hoses and hose terminations

should

be product-identified via high visibility bands, tape or other means.

Below is the colour coding to be used for the Hose End Coupling (colour refers to coupling and not hose)

which is passed to the supply vessel.