Table of Contents Table of Contents
Previous Page  300-Cargo Operations / 748 Next Page
Information
Show Menu
Previous Page 300-Cargo Operations / 748 Next Page
Page Background

Car

g

o

Op

erations

BOS-PRD-07.900602

4

.

9

.

2 Du

rin

g bu

lk

c

ar

g

o o

p

erations

The

Master

or person appointed for the task

shall

ensure that he/she can see the bulk hose(s) at all times

and he/she

shall

not allow other operations to distract his/her attention away from the hose(s).

The bridge and installation responsible or shore provider (as applicable)

shall

confirm quantities discharged

and received.

The deck crew, installation crane driver or shore provider (as applicable)

shall

be readily available and close

at hand throughout any transfer operation.

Sufficient warning

shall

be given by each party prior to changing over tanks.

Installation, provider or vessel valves

shall

never be closed against an operating cargo pump.

If at any stage in the operation, the

Master

, provider or installation responsible are in any doubt as to the

integrity of the operation, then the operation

shall

be terminated.

The loading rate

shall

be reduced to a manageable level to allow the receiver to top off tanks safely.

When pumping has finished, purge air

shall

be used to clear the lines (dry bulk).

Pressurised air

shall

be released before disconnecting the hose (dry bulk).

When the hose is disconnected the end

shall

be fitted with a suitable cap or blank.

During periods of darkness, adequate illumination

shall

be available throughout the operation.

All bulk hoses used offshore are to be of sufficient length for safe operation and have internally swaged or

other approved clamp fittings.

Unapproved repairs to hoses

shall not

be made. In the transfer of bulk products, consideration

shall

be given

to the fitting of self-sealing weak link couplings in the hose string.

4

.1

0

Man

u

al

S

o

u

n

d

in

g

Met

h

o

d

s

Man

u

al

S

o

u

n

d

in

g

Met

h

o

d

:

Sounding is a method used to measure the height of the fluid from the surface of the fluid to the bottom of

the tank.

The vessels are equipped with sounding tubes and reinforcing plates under the tubes. Sounding tubes are

steel pipes which lead upwards from the ships' tanks to a place on deck.

In this method, a sounding device is used with a heavy weight bob attached to one end of the sounding

device using a strap hook. To perform the measurement the sounding device is passed through the

sounding tubes. The weight of the lead of the sounding device strikes the reinforcing plates when it reaches

the bottom of the tank. The height of the fluid can be measured from the markings made by the fluid on the

graduations of the sounding device.

The volumetric quantity of the tank

shall

be determined by the sounding table in the sounding book.

Ulla

g

e meas

u

rement Met

h

o

d

:

Ullage is the void space in the tank, measured from the top of the tank to the upper surface of the fluid.

The ullage device may be portable and hand carried and/or motorized. The measurement can be performed

by the opening of the ullage hatch (ex: man-hole’s cap located on the upper part of the tank).

The volumetric quantity of the tank

shall

be determined by the ullage table in the sounding book.

Version 04. Original date: 22/06/2012. Version date: 31/12/2014. Valid version only on QMS site. Uncontrolled document when printed.

Procedure prepared by: BOS Operations Department Project Manager. Approved by: BOS Operations Manager Director. Validated by: BOS Quality Representative

9 / 17

300