BOS-PRD-07.900608

4

.

3

.

6 P

ost

-

contract award

The competent contract holder to be accountable for:

x

Conducting a pre-execution HSE assessment and audit;

x

Authorising the

Contractor

to commence work if the pre-execution HSE requirements are met;

x

Monitoring performance of the

Contractor

against its HSE action plan;

x

Authorising deviations from the

Contractor

’s HSE plan;

x

Authorising additional HSE requirements as deemed necessary;

x

Applying sanctions in the event of unauthorised deviations from the

Contractor

’s HSE plan;

x

Preparing HSE close-out report using the

BOS-FRM-0701.0029 Sub-Contractor Appraisal Result

x

and distribute to appropriate

Client

and

Contractor

personnel for feedback.

4

.

3

.

7 B

rid

g

in

g

doc

u

m

entation and H

SE P

lan

If identified during the assessment or audit,

Sub-

contractor

bridging documents and any HSE Plans

shall

be

prepared in order to ensure understanding of required emergency and safety procedures for

Sub-

contractor

personnel working and being onboard Company vessels.

The

Sub-

contractor

bridging documents and any HSE Plans

should

provide for the following:

x

Contingency planning for medical emergency;

x

Action plan, roles and responsibilities relative to

MoC

and

JSA

;

x

Documented instructions with regard to HSE;

x

Vessel specific safety requirements (to be written and provided on a vessel specific basis by the

Master

or his/her delegate);

x

Identification of safety Representatives onboard (vessel and

Sub-

contractor

).

The vessel

S

a

f

ety

Su

pervisor

and Sub-contractor representative is responsible for ensuring that all such

information and associated requirements are clearly transmitted to the

Sub-

contractor

workforce.

4

.

3

.

8

Kick o

ff

m

eetin

g

A post award meeting

should

be used as an opportunity for the

Contractor

(

s

)

/

Sub-

contractor

(

s

)

to become

familiar with the location, facility, personnel, and other relevant information.

The meeting is generally recognised as an important interfacing step in working together to prevent

incidents. The topics covered by the meetings

should

include:

x

Review of interface documentation;

x

Review of associated major risk controls;

x

Confirmation that the activities/deliverables described in HSE planning for completion pre-

mobilisation

shall

be satisfactorily implemented including confirmation that roles and responsibilities

have been clearly defined and understood;

x

Confirmation of personnel competence. This includes both client and contract personnel who are

exposed to workplace hazards as defined in the scope of work and risk assessment phases;

x

Confirmation of benchmarking and any HSE Key Performance Indicators (KPIs);

x

Explanation of the basic HSE rules and work procedures as defined in the HSE plan;

x

Confirmation of the scope and schedule of HSE activities, E.g: HSE meetings, audits and reviews;

x

Interaction of

Client’s

and

Contractors

emergency plans (security, pandemic disease, evacuation

etc);

x

Contact with Third parties to assure their role in emergency plans is known;

x

Confirmation that HSE induction and training plans are in place and ready for start-up;

x

Briefing of Sub-contractor’s management on HSE requirements;

x

Incident reporting and investigation procedures;

x

Process for agreeing upon, reporting, tracking and closing out non-compliance.

Version 04. Original date: 04/06/2012. Version date: 31/12/2014. Valid version only on QMS site. Uncontrolled document when printed.

Procedure prepared by: BOS Operations Department Project Coordinator. Approved by: BOS Head of Operations. Validated by: BOS Quality Representative.