BOS-PRD-07.900608

One of the most important contract management decisions is to identify the mode which specifies the

responsibilities for managing HSE between

Client

and

Contractor

, or alliance of

Contractors

.

Two distinctly different modes are described below.

Selection of only one of these modes is preferred and

should

be in alignment with local and national

legislative requirements; however, in certain situations it may be necessary to adopt a mixture of modes 1

and 2.

The interfacing of activities between Company,

Contractors

and

Sub

-contractors

should

be agreed by

making a gap analysis and assessment of their

Safety Management System

.

The SMS elements that take precedence

should

be specified by means of system bridging and HSE

planning before work commences.

4.3.2 Mode 1

The

Contractor

provides people, processes and tools for the execution of the contract under the

supervision, instructions and

Company Safety Management System

(SMS).

The

Contractor

has a management system to provide assurance that the personnel for whom it is

responsible are qualified and fit for the work and that the processes, tools, materials and equipment they

provide are properly maintained and suitable for the contract.

4.3.3 Mode 2

The

Contractor

executes all aspects of the contract under its own SMS, providing the necessary instructions

and supervision and verifying the proper functioning of its SMS.

Company is responsible for verifying the overall effectiveness of the HSE management controls put in place

by the

Contractor

, including its interface with

Sub

-contractors

, and assuring that both Company and

Contractor

’s SMS are compatible.

4

.

3

.

4 P

re-contract award

Appoint a competent single point of contact contract holder who

shall

have responsibility for the following

(E.g.

Operations Mana

g

er

):

x

Conduct a structured HSE assessment of the anticipated contract;

x

Assess contractor capability for establishing the bidder’s list (if required) using standard HSE criteria;

x

Prepare contract HSE specifications for inclusion in the tender documentation;

x

Prepare an audit and assessment program to evaluate potential

Contractors

;

x

Evaluate

Contractor

’s HSE plans and assure the adequacy of the

Contractor

’s HSE plan;

x

Develop Company HSE action plan in line with

Management of Change

(MoC).

4

.

3

.

5 Au

dit and e

v

al

u

ation

The

Contractor

S

M

S

shall

be evaluated by use of Company

BOS-FRM-0701.0026 – Sub-Contractor

Assessment

prior to commencement of work and on a yearly basis. Shipmanager may delegate the audit

process to the Contracting company, and will recover the audit report for filing.

NOTE: When sub-contracting involves the use of ‘Charter Party’ agreements for vessels with Third party companies performing services

for Company clients, an internal audit

shall

be conducted using Company audit protocol to identify any areas of non-compliance with

contract requirements.

Version 04. Original date: 04/06/2012. Version date: 31/12/2014. Valid version only on QMS site. Uncontrolled document when printed.

Procedure prepared by: BOS Operations Department Project Coordinator. Approved by: BOS Head of Operations. Validated by: BOS Quality Representative.