Table of Contents Table of Contents
Previous Page  231-Passage Planning and Manoeuvring / 748 Next Page
Information
Show Menu
Previous Page 231-Passage Planning and Manoeuvring / 748 Next Page
Page Background

P

assa

g

e

P

lannin

g

and Manoeu

v

rin

g

BOS-PRD-07.900503

Version 04. Original date: 01/06/2012. Version date: 31/12/2014. Valid version only on QMS site. Uncontrolled document when printed.

Procedure prepared by: BOS Head of Operations. Approved by: BOS Head of Operations. Validated by: BOS Quality Representative.

5 / 13

4

D

escri

p

tion

4

.1

P

assa

g

e

p

lannin

g

Passage planning is a mandatory company requirement. A Passage Plan

shall

be formulated for each

voyage and updated when necessary for each separate passage made by the vessel along the same route.

Passage planning is required from berth to berth and

shall

include any intermediate offshore locations such

as drilling rigs and platforms.

The

Master

is responsible for establishing and approving the Passage Plan but can delegate preparation to

another Officer.

Prior to proceeding to sea, the

Master

shall

:

x

Consult with the

C

hie

f

En

g

ineer

to verify that the vessel has sufficient fuel, water and lubricants for

the intended voyage;

x

Ensure that the intended voyage has been planned using appropriate charts and publications for the

area concerned. The charts and publications used in the preparation of the Passage Plan

shall

be

documented in the Passage Plan;

x

The courses laid down for the Passage Plan are safe;

x

Consider at which specific points of the passage there may be a need to utilise additional deck or

engine room personnel;

x

Consider whether any particular circumstance, such as the forecast of restricted visibility in an area

where position fixing by visual means at a critical point is an essential feature of the Passage Plan

introduces an unacceptable hazard to the passage. He or she

shall

determine whether that section

of the passage

shall

be attempted under the conditions prevailing or likely to prevail.

x

Consider security conditions in the sailing area.

The plan

shall

be available at all times on the bridge to allow

Brid

g

e Watch O

ff

icers

immediate access and

reference to the details of the plan.

Each

Brid

g

e Watch O

ff

icer

shall

view and discuss the Passage Plan as applicable during each watch

handover.

The progress of the vessel in accordance with the Passage Plan

shall

be closely and continuously

monitored.

Any information related to the present or future passage

shall

be reported to the

Master

and the Passage

Plan

shall

be updated, as the situation requires.

Whenever necessary to deviate substantially from the planned route, an amended route

shall

be planned

and approved by the

Master

.

If the Passage Plan is modified during the voyage, for example changes in course or speed to those

specified or required because of a potentially hazardous situation; a new destination or changing weather

conditions, the

Master

or duty

Brid

g

e Watch O

ff

icer

shall

ensure that subsequent relieving

Brid

g

e Watch

O

ff

icers

are aware of the changes before assuming watch duty. Such changes to the Passage Plan

shall

be

recorded in the Bridge Logbook.

4

.1.1 Esta

b

lishin

g

the

P

assa

g

e

P

lan

The Passage Plan

shall

be established before departure of the vessel taking into account the following

factors:

x

The condition and state of the vessel, its stability, and its equipment; any operational limitations; its

permissible draught at sea in fairways and in ports; its manoeuvring data, including any restrictions;

231