Table of Contents Table of Contents
Previous Page  229-Passage Planning and Manoeuvring / 748 Next Page
Information
Show Menu
Previous Page 229-Passage Planning and Manoeuvring / 748 Next Page
Page Background

P

assa

g

e

P

lannin

g

and Manoeu

v

rin

g

BOS-PRD-07.900503

Version 04. Original date: 01/06/2012. Version date: 31/12/2014. Valid version only on QMS site. Uncontrolled document when printed.

Procedure prepared by: BOS Head of Operations. Approved by: BOS Head of Operations. Validated by: BOS Quality Representative.

3 / 13

1

P

ur

p

ose

The highest standards of operational planning, monitoring and execution are fundamental to the safety of

vessels and their crews, and for the protection of the environment.

In compliance with the

ISM Code

, requirements of

OSM Guidelines

and industry best practices referenced in

this document, this procedure has been developed and

should

be used in association with company

procedures in relation to management of risk.

2

Sco

p

e

A Passage Plan is a navigational aid for

Brid

g

e Wa

t

ch O

ff

icers

and ensures that the vessel can be

navigated safely from one point to another. The Passage Plan

shall

determine the shortest, safest and most

economical route whilst maintaining adequate passing distances from identified hazards and allowing safety

margins as required.

229