Table of Contents Table of Contents
Previous Page  235-Passage Planning and Manoeuvring / 748 Next Page
Information
Show Menu
Previous Page 235-Passage Planning and Manoeuvring / 748 Next Page
Page Background

P

assa

g

e

P

lannin

g

and Manoeu

v

rin

g

BOS-PRD-07.900503

Version 04. Original date: 01/06/2012. Version date: 31/12/2014. Valid version only on QMS site. Uncontrolled document when printed.

Procedure prepared by: BOS Head of Operations. Approved by: BOS Head of Operations. Validated by: BOS Quality Representative.

9 / 13

4

.

2

.

5

Ch

e

c

ks/

c

h

e

c

klis

t

s/do

c

u

m

en

t

a

t

ion

Before leaving or entering port, the

Mas

t

er

and

Ch

ie

f

En

g

ineer

shall

ensure that all necessary equipment as

defined on the applicable Pre-Arrival and Pre-Departure Checklists has been tested.

The

Mas

t

er

and

Ch

ie

f

En

g

ineer

may delegate this task to the respective

Wa

tc

h

O

ff

i

c

er

but

shall

ensure

that the checklists have been properly completed and that an appropriate entry has been recorded in the

Bridge and Engine Room Logbooks as applicable.

4.2.5.1 Notifications

The following notifications

shall

be implemented before arrival or departure:

x

Inform the

Mas

t

er

of expected time of arrival (ETA) or departure (ETD). The

Mas

t

er

is normally the

S

h

ip

S

e

c

uri

t

y O

ff

i

c

er

(SS

O

)

;

x

Inform the engine room of the expected time of arrival or departure, establish and test

communications with the control room;

x

Alert the engine room before initiating tests of critical equipment;

x

Assign a crewmember in the bridge for emergency backup, ensure that sufficient crewmembers are

ready, and prepared to handle ropes and assist as required with berthing/un-berthing;

x

Establish and check communications with the crewmembers at the mooring stations;

x

Communicate ETA/ETD to the port, agent, logistic service, office, customer representative or

P

ilo

t

as required or necessary;

x

Contact the

P

or

t

Fa

c

ili

t

y

S

e

c

uri

t

y O

ff

i

c

er

(PFSO) to determine if a Declaration of Security (DOS) is

needed;

x

Inform the SSO of arrival or departure time. The SSO

shall

alert any passengers as necessary.

4.2.5.2 Arrival and Departure Documents and Information

The following arrival and departure documents and information

shall

be checked:

x

Ensure that the cargo is consistent with the manifest/bill of lading;

x

Establish the present state of the tide, current and other weather conditions;

x

Check the vessel’s drafts and enter the readings in the

Bridge Logbook;

x

Check that the Passage Plan is properly established. Make the necessary approval;

x

Ensure that nautical charts and documents are readily available;

x

Determine the level of security prevailing in the port, berth, or mooring zone;

x

Take note of any information concerning the vessel or cargo from the port, agent, customer or similar

logistics service.

4

.

3

Workin

g w

i

t

h

pilo

t

s

It is important that the responsibilities of the

P

ilo

t

and the

Mas

t

er

are clearly agreed and understood when

working together.

When a

P

ilo

t

is onboard, the

Mas

t

er

retains the responsibility and over-riding authority on the vessel. The

presence of the

P

ilo

t

does not relieve the

Mas

t

er

or the

Wa

tc

h

O

ff

i

c

er

of their duties and obligations for the

overall safety of the vessel.

Once a

P

ilo

t

arrives on the bridge, he

shall

join the bridge team.

Depending on local pilotage laws, the

Mas

t

er

may delegate the conduct of the vessel to the

P

ilo

t

who

directs the navigation of the vessel in close co-operation with the

Mas

t

er

and/or the

Brid

g

e Wa

tc

h

O

ff

i

c

er

.

Mas

t

er

and

Brid

g

e Wa

tc

h

O

ff

i

c

er

shall

be prepared to exercise their authority and responsibility

should

it

be considered that the vessel would be placed in any hazard by the actions or directions of the

P

ilo

t

.

235