Table of Contents Table of Contents
Previous Page  237-Passage Planning and Manoeuvring / 748 Next Page
Information
Show Menu
Previous Page 237-Passage Planning and Manoeuvring / 748 Next Page
Page Background

P

assa

g

e

P

lannin

g

and Manoeu

v

rin

g

BOS-PRD-07.900503

Version 04. Original date: 01/06/2012. Version date: 31/12/2014. Valid version only on QMS site. Uncontrolled document when printed.

Procedure prepared by: BOS Head of Operations. Approved by: BOS Head of Operations. Validated by: BOS Quality Representative.

11 / 13

4

.

4

.1

R

ou

t

ine

t

es

t

in

g

o

f

s

t

eerin

g

c

on

t

rol s

y

s

t

e

m

s

In addition to pre-arrival and departure checks, the routine and periodic testing of vessel Critical Systems

shall

be outlined in the vessel Planned Maintenance System (PMS) however routine testing of steering gear

and emergency ‘back up ‘steering system

s

shall

be performed and recorded in the Bridge Logbook and

official logbook (where required).

4

.

4

.

2

T

rans

f

er o

f m

anoeu

v

rin

g

c

on

t

rols

The transfer of bridge manoeuvring controls from one mode or operating location to another for example,

forward to after control position,

shall

only be done in accordance with this procedure; strict compliance is

essential to avoid a potential accident.

Mas

t

ers

and

Brid

g

e Wa

tc

h Keepin

g

O

ff

i

c

ers

shall

be responsible for ensuring that the following procedure

is effectively implemented:

x

Check all control levers are in the correct/neutral positions;

x

Ensure vessel movement and environmental impacts are fully considered;

x

Check that engine controls are set to zero pitch;

x

Check that rudder controls are

set to the “mid

-

ships” position;

x

Check that all controls are properly transferred and can be operated correctly;

x

When transferring control between bridge and engine room, check that controls are set to zero

before transferring and/or before acknowledging the transfer;

x

When transferring from “manual” to “joystick” and/or back to “manual”

- ensure the vessel is at a safe

distance from the installation and sufficient time and space is available to revert to manual controls

as necessary.

4

.

4

.

3

T

rainin

g

require

m

en

t

-

m

anoeu

v

rin

g

and ‘ship handling’

Every opportunity

should

be provided to both Senior and Junior

De

c

k O

ff

i

c

ers

in Ship handling and

maneuvering of the vessel to enable them to become more proficient and competent in their role and to

ensure the Company and vessel

Mas

t

er

has a redundant alternative solution in times of emergency or

contingency.

Training

shall

always be conducted under strict supervision of the

Mas

t

er

, experienced

Brid

g

e O

ff

i

c

er

,

R

e

f

eren

t

C

ap

t

ain

or

S

uperin

t

enden

t

and undertaken in areas free from external hazards or traffic

congestion.

Competence in ship handling

shall

be mo

nitored as part of the ‘Competence Management

S

ystem’ with

additional training provided as appropriate to individual competence and career path objectives of the

Company. Simulators are available in BOURBON Training Centers for the purposes of providing training in

addition to ‘on board training’.

237