R

eliabilit

y

and Maintenance

P

rocedure

BOS-PRD-2601.900401

For vessels where Task Assistant

TM

is implemented, any improvement or modifications (maintenance job,

spare parts, stores) is to be formalized following guidelines and using standard forms mentioned in Section 6

Related Documents.

4.4

D

e

f

ect re

p

ortin

g

All breakdowns, component failures and other technical defects under warranty or not

shall

be reported

according to Company documented requirements.

All defect reports

shall

be reported in Task Assistant

TM

or using the defect report standard form

BOS-FRM-

10.0008 Defect report form

if Task Assistant

TM

is not available or does not allow defect reporting.

In addition to the defect report and as per instruction

BOS-INS-01.1205 Use of Action plan BO Surf

, the

Operation Action plan

shall

be updated by

Ve

ss

el Ma

s

ter

.

If the defect is related to a Critical Equipment, this

shall

be highlighted in the report.

Critical equipment related orders

shall

be highlighted and processed with high priority.

In the situations listed hereafter,

Technical

S

u

p

erintendent

shall

, after damage review, integrity

assessment and corrective action plan development, notify Classification Society at the earliest :

x

Collision, grounding, fire, flooding, pollution;

x

Unavailability of vessel propulsion system, shaft or gearbox;

x

Unavailability of vessel Main Engine or Genset.

If a Condition of Class is raised, this

shall

be processed as described in § 4.12.

O

p

eration

s

Mana

g

er

shall

ensure defect notification to the vessel Flag Authority.

For new built vessels covered by warranty (warranty period lasts 1 year after vessel delivery date), any

defect reported in Task Assistant is also to be recorded in the vessel Warrantly Claim List. The updated list

shall

be sent on a weekly base to the

Technical

S

u

p

erintendent

in charge of the vessel, as well as to the

Ne

w

Buildin

g

Warrant

y

O

ff

icer

.

For vessel where Planned Maintenance Period warranty applies (i.e. until 6 months after shipyard departure

date), instructions provided in

BOS-PRD-10.900402 – Planned Maintenance Period Management Procedure

shall

be applied.

4.

5 Sp

are

p

art inventor

y

m

ana

g

e

m

ent

Spare parts and equipment inventories (including Paint and lashing equipment inventories)

shall

be

managed and monitored through the vessel CMMS (Task Assistant

TM

or Excel file). Once updated, the

inventory must be attached to the CMMS.

Physically, all spare parts

shall

be well protected, stored in dedicated and appropriate areas (clean, tidy, dry,

air conditioning for electronical items etc.) and labelled to allow easy finding and access.

For parts related to critical or show stoppers equipment,

Ma

s

ter

shall

ensure that inventory is permanently

up to date and that quantities are available on board as per minimum requirements indicated in CMMS.

For parts not related to critical or show stoppers equipment,

C

hie

f

En

g

ineer

and

C

hie

f

O

ff

icer

(as agreed

by

Ma

s

ter

)

shall

randomly control the inventory during their period on board.

Once a year, a complete inventory verification

shall

be carried out as to ensure there is no discrepancy

between the computer and physical information. Notification of complete inventory

shall

be entered in the

Ma

s

ter

and

C

hie

f

En

g

ineer re

sp

ective

handover reports.

Additionally, Bourbon Corporate Organisation has established a Central Warehousing Data System with

accounts for shore-based storage of spare parts and components which can be accessed by Technical

Management through the

Purchasing and Supply Chain process

.

Version CR(BOS-PRD-10.900401). Original date: 28/05/2012. Version date: 31/12/2014.Valid version only on QMS site. Uncontrolled document when printed

Procedure prepared by: BOS Technical Manager. Approved by: BOS Technical Manager. Validated by: BOS Quality Representative.

7 / 21

149