R

eliabilit

y

and Maintenance

P

rocedure

BOS-PRD-2601.900401

x

Establish a requirement for shore staff to conduct routine vessel inspections and confirm that

planned maintenance has actually taken place;

x

Provide a defect-reporting and close-out system that can be monitored both onboard and ashore.

The system

should

specify a formal process for notifying shore management when critical equipment

is taken out of service and

should

include methods for recording management’s approval of any

mitigating steps introduced while the equipment is out of service.

All vessels

shall

undergo planned maintenance defined in accordance with recommendations from

equipment suppliers, Classification Societies, Flag State and any other relevant authorities.

4.

2 V

e

ss

el

sp

eci

f

ic

p

rocedure

s

The following emergency procedures

shall

have a procedure/instruction plate placed next to the equipment

or if not practical, to be posted in appropriate locations:

a) Recovery after black out;

b) Back-up procedure for variable pitch control;

c) Emergency operation of fire pump;

d) Operation and connection of back-up generators (black-out);

e) Routine operation of bilge pump system;

f) Emergency operation of bilge pump system;

g) Emergency steering systems;

h) Emergency starting of auxiliary generator.

The following vessel specific procedures for operation of machinery and equipment

shall

be developed and

documented onboard each vessel as applicable:

a) Start-up and operation of main, generator and thruster engines;

b) Operation of oily water separator;

c) Operation of Fi-Fi equipment;

d) Operation of electric power system (start-up/connection);

e) Operation of waste water treatment plant;

f) Operation of cargo pumping equipment;

g) Operation of oil and diesel oil separators;

h) Start-up and operation of hydraulic equipment.

4.

3 C

o

m

p

uteri

s

ed Maintenance Mana

g

e

m

ent

Sys

te

m

s (C

MM

S)

In order to improve vessel integrity, a Computerised Maintenance Management Systems

is

used on board

each vessel as well and duplicated in Head Office.

Task Assistant

TM

is in use on most of vessels.

For other vessels where Task Assistant

TM

is not implemented, a set of tools approved by

Technical

Mana

g

er

(Excel file for maintenance jobs and spares inventory management, Docsea

TM

for spares

purchasing creation and follow up) is used as CMMS.

Built on the vessel equipment list, the CMMS main modules are:

x

Planned and corrective maintenance activities management. This includes

9

Unscheduled jobs (including Defect) creation, follow up and final report.

9

Scheduled maintenance activities follow up and final report (including survey jobs, alarms

test, tanks ballasts and void space inspections).

9

Critical equipement and maintenance activities identification.

9

Drydock jobs preparation and report.

x

Spares inventory (including critical spare parts) management.

x

Spares purchasing request creation and follow up.

V

e

ss

el O

ff

icer

s

,

Technical

S

u

p

erintendent

s

,

Technical Mana

g

er

have the responsibility for the correct

use of Computerised Maintenance Management Systems.