Version 04. Original date:25/05/ 2012. Version date: 31/12/2014. Valid version only on QMS site. Uncontrolled document when printed.

Procedure prepared by: BOS Environmental Coordinator. Approved by: BOS QHSES Manager. Validated by: BOS Quality Representative.

6 / 8

Cruise Speed (up to 10 knots), i.e. with two DGs, is to be performed only as per instruction from

client,

C

ontra

c

t

s

Mana

g

er

or

O

p

eration

s

Mana

g

er

for commercial reasons;

Emergency Speed (above 10 knots), i.e. with three DGs,

shall

only be authorised under exceptional

reasons (rescue operations, immediate hazard to vessel, property or environment).

4

.1.

4

S

tand

by

at

s

ea

On-field stand-by

shall

be performed with one DG running after proper risk evaluation (considering offshore

installation vicinity, weather and tidal conditions, vessel integrity, etc.).

Evaluation of stand by time

shall

be if possible discuss with onshore/offshore logistic.

If an offshore buoy or anchorage area is available

Ma

s

ter

shall

require authorization to proceed to buoy or

anchorage to onshore/offshore logistic in order to optimize fuel consumption.

4

.1.

5

On

f

ield O

p

erational

S

tand

B

y

in

s

ide

500m

z

one

If Operational Stand by time inside 500 meter zone exceeds 30 minutes,

Ma

s

ter

shall

contact

O

ff

s

hore

I

n

s

tallation Mana

g

er

/Radio Room to request if it is possible to proceed outside 500 meter zone to go back

to normal stand by and be able to reduce the number of engine. After proper risk evaluation (considering

offshore installation vicinity, weather and tidal conditions, vessel integrity, etc.).

For any clarification or assistance, please contact your

O

p

eration

s

Mana

g

er

.

4

.

2

Fuel Mana

g

e

m

ent on

T

raditional

p

ro

p

ul

s

ion ve

ss

el

4

.

2

.1 Har

b

our

S

tand

by

Ma

s

ter

shall

optimized number of auxiliary engine use in port to one when applicable.

4

.

2

.

2

T

ran

s

it

Before any transit, the

Ma

s

ter

shall

estimate the best economical speed taking at least into account

the vessel deadweight, the trim and the weather forecast.

This economical speed

shall

be proposed to client onshore logistic or to Offshore

I

n

s

tallation

Mana

g

er

/Installation Radio room depending of the transit type (to port/interfiled/to field).

4

.

2

.

3

On

f

ield O

p

erational

S

tand

B

y

in

s

ide

500m

z

one

If Operational Stand by time inside 500 meter zone exceeds 30 minutes,

Ma

s

ter

shall

contact

O

ff

s

hore

I

n

s

tallation Mana

g

er

/Installation Radio Room to request if it is possible to proceed outside 500 meter zone

to go back to normal stand by.

For any clarification or assistance, please contact your

O

p

eration

s

Mana

g

er

.

4

.

2

.

4

S

tand

by

at

s

ea

Evaluation of stand by time

shall

be if possible discuss with onshore/offshore logistic.