J
ob Safet
y
A
nal
y
sis
BOS-PRD-03.900901
5 R
ecords
x
G-JSA Forms
x
Check Lists
x
“B-FRM-03.0057 - Specific Job Safety Analysis Form” (S-JSA);
x
ToolBox Talks Records.
6 R
elated docu
m
ent
x
B-GDL-03.0007 – OSM Guidelines.
x
4C, BOURBON.
x
BOS-PLN-03.120201 - BOS Master Safety Document (=DUP).
x
BOS-PLN-03.120202 - BOS Document Unique de Prévention (=MSD).
x
BOS-FRM-03.0050 – Risk Analysis per Job Area.
x
BOS-SPC-11.0001 - ToolBox Talks Logbook.
GS
A
for
m
s:
BOS-FRM-03.0037 – G-JSA # 1 – Hotwork.
BOS-FRM-03.0038 – G-JSA # 2 – Electrical Work.
BOS-FRM-03.0039 – G-JSA # 3 – Work Aloft/Overboard.
BOS-FRM-03.0040 – G-JSA # 4 – Enclosed Space Entry.
BOS-FRM-03.0041 – G-JSA # 5 – Pressurised System.
BOS-FRM-03.0042 – G-JSA # 6 – Diving Operations.
BOS-FRM-03.0043 – G-JSA # 7 – Loading / Offloading Deck Cargo.
BOS-FRM-03.0044 – G-JSA # 8 – Loading / Offloading Oil Based Product.
BOS-FRM-03.0045 – G-JSA # 9 – Loading / Offloading Water Based Product.
BOS-FRM-03.0046 – G-JSA # 10 – Loading / Offloading Dry Bulk Product.
BOS-FRM-03.0047 – G-JSA # 11– Passenger Transfer via Frog or Basket.
BOS-FRM-03.0048 – G-JSA # 12 – Launching Recovery of Rescue Craft.
BOS-FRM-03.0049 – G-JSA # 13 – Engine Room work involving Tag Out / Lock Out.
BOS-FRM-03.0052 – G-JSA # 14 – Crewboat Pax Transfer via Boat-Landing.
BOS-FRM-03.0051 – G-JSA # 15 – Loading / Offloading Methanol.
BOS-FRM-03.0068 – G-JSA # 16 – Helicopter Operation With Helideck.
BOS-FRM-03.0069 – G-JSA # 17 – Helicopter Winching.
C
heck list for
m
s
:
BOS-FRM-03.00010 – CL # 1 – Bridge Pre-Departure Checklist;
BOS-FRM-03.0025 – CL # 2 – 500m zone Pre-Entry Checklist;
B-FRM-18.0001 – CL # 3 – New Building Hand-Over Checklist;
BOS-FRM- 03.0034 – CL # 4 – Bridge Pre-Arrival Checklist;
BOS-FRM-03.0023 – CL # 5 – Anchor Handling / Towing Preparation Checklist;
BOS-FRM-03.0026 – CL # 6 – Helicopter Landing Officer Checklist;
BOS-FRM-03.0024 – CL # 7 – Engine Pre-Departure Checklist;
BOS-FRM-03.0030 – CL # 8 – Hydrocarbon/Fuel Transfer Checklist;
BOS-FRM-03.0032 – CL # 9 – Engine Pre-Arrival Checklist;
BOS-FRM-03.0031 – CL # 10 – Dry-Bulk Transfer Checklist;
BOS-FRM-03.0036 – CL # 11 – Personnel Basket Transfer Checklist;
BOS-FRM-03.0007 – CL # 12 – Rescue Craft Pre-Launch Checklist;
CL # 19 – Loading / Offloading Methanol (in project)
BOS-FRM-03.0028 – CL # 14 – Wet Bulk transfer Checklist;
BOS-FRM-03.0058 – CL # 15 – Heavy Weather Checklist;
BOS-FRM-03.0059 – CL # 16 – Restricted Visibility Checklist;
Version 04. Original date: 25/05/2012. Version date: 31/12/2014. Valid version only on QMS site. Uncontrolled document when printed.
Procedure prepared by: BOS Senior QHSE Coordinator. Approved by: BOS QHSES Manager. Validated by: BOS Quality Representative
13 / 14
523




