Table of Contents Table of Contents
Previous Page  375-DP Operations Procedure / 748 Next Page
Information
Show Menu
Previous Page 375-DP Operations Procedure / 748 Next Page
Page Background

DP Op

erations

P

rocedure

BOS-PRD-0701.900606

4.

3 DP Sy

ste

m

certi

f

ication and veri

f

ication

4.

3

.1

DP

F

MEA

x

DP FMEA (Failure Modes and Effects Analysis)

proving trials are reviewed at the delivery date of the

vessel. This latter

shall

be done after :

1 Modifications on DP system or set up new Position Reference System for example;

2 Upgrades, DP class 1 to DP class 2 for example;

3 Charterer request;

4 After 5 years.

x

This DP trial is compulsory for vessel DP class 2 or 3 and may be requested by charterer for DP

OSV Capability 1.

x

DP FMEA is performed by a Third party.

x

Last FMEA report

shall

be archived in appropriate binder as per

BOS SMS vessel filing system

and

is a part of DP vessel familiarization.

x

FMEA proving trial(s) are described in

IMCA guidelines M 166 “Guidance on Failure Modes & Effects

Analyses (FMEAs).

4.

3

.

2 A

nnual

DP

trials

x

This DP test is performed on a yearly basis after the FMEA date of anniversary +/- 3 months for all

DP class vessels.

x

A Third party may be contracted to do annual DP trials for BOS vessels. A Company’s

M

aster

,

C

hie

f

E

ngineer

or a

DP

e

xp

ert

, external of the vessel, may perform annual DP trials, using DP annual test

report as per

IMCA Guidelines M 190 “Guidance for Developing and Conducting Annual DP Trials

Programmes for DP Vessels”

.

x

Last Annual DP trials report

shall

be printed and archived in binder 113C, as per BOS SMS Vessel

Filing System.

x

Annual DP trial informations are described in

IMCA guidelines M 190 “Guidance for Developing and

Conducting Annual DP Trials Programmes for DP Vessels”

.

4.

3

.

3 DP C

a

p

a

b

ilit

y p

lots

x

Vessel’s Master

shall

ensure that DP Capability plots are available on board.

x

Capability plots

shall

be printed and archived in appropriate binder as per BOS SMS Vessel Filing

System.

Version 03. Original date: 13/02/2014. Version date: 31/12/2014. Valid version only on QMS site. Uncontrolled document when printed.

Procedure prepared by: BOS Project Coordinator. Approved by: BOS Senior of Operations Director. Validated by: BOS Quality Representative.

7 / 11

375