DP Op
erations
P
rocedure
BOS-PRD-0701.900606
b) Notifying well in advance the
Op
erations Manager
when customer’s expectations exceed Bourbon
Offshore DP Guidelines
and
DP Operations Best Practices
.
4 D
escri
p
tion
G
eneral
x
All personnel involved in DP operations
shall
take knowledge of this DP procedure.
x
DP personnel
shall
refer to
Bourbon DP Operations Best Practices
for generic part and, to
“
Guidance on vessel specific part
” for vessel specifications. This latter
shall
be available at the
Bridge and Engine Control Room.
x
DP personnel
shall
fill up relevant acknowledgement forms at Bridge for DPOs and Engine Control
Room for engineers after having conducted a DP familiarization.
4
.1
DP Op
erations Manual on
b
oard
4
.1.1
S
tructure
x
All BOS DP vessels
shall
implement this DP procedure on board.
x
As per BOS SMS vessel filling system, binder 113 contains DP Procedure. Nevertheless, to be easy
to read and to use, BOS Head Office Management decided to divide binder 113 in 3 parts at the
Bridge and, set up an additional binder at the Engine Control Room (binder 306).
x
Structure of Binder 113 DP Manual, as following:
113A - DP Manual;
113B - DP Manual records;
113C - DP trials records.
x
Refer to
BOS-DRT-11.0003-Vessel Filing System
for detailed structure of binder 113A-113B-113C
and 306.
Version 03. Original date: 13/02/2014. Version date: 31/12/2014. Valid version only on QMS site. Uncontrolled document when printed.
Procedure prepared by: BOS Project Coordinator. Approved by: BOS Senior of Operations Director. Validated by: BOS Quality Representative.
5 / 11
373