If the vessel is setting up on the weather side/up current side of an installation, the set up safety

assessment position must be a minimum of 100m distant such that in the event of blackout, she

shall

drift clear and past the installation;

x

Any discharges from the installation that may cause a threat to the health of personnel or a hazard to

the vessel’s safe operation are prohibited. This

should

be confirmed with the installation prior to

commencing operations;

x

If any discharges are planned that

shall

affect the vessel, the

Master/Bri

dg

e Watc

h

O

fficer

shall

agree a plan with the installation to ensure that communication of the event is given in a timely

manner in order that the vessel may cease operations and stand off until the discharge operations

have ceased;

x

Always be aware that a loss of power or a technical failure may occur during the approach or

manoeuvring exercise.

AL

W

AYS

B

E

P

RE

P

ARED

F

OR THE UNEX

P

ECTED

4

.1.

3

Workin

g

on location

Soon after arrival, the scope and order of work

shall

be discussed and agreed, such as the following:

x

Discharging and/or back loading of deck cargo;

x

Bulk liquids and/or bulk solids;

x

Handling anchors and associated equipment;

x

Connecting/disconnecting a tow;

x

Full pre-task safety planning

shall

be completed for each task, taking into account the situational

hazards such as cranes, projections, flare booms, heli-decks, anchor wires, surface buoys, or

installation propulsion thrusters;

x

The vessel

shall

be properly ‘set up’ and stabilised. Giving due consideration to the vessel’s position

in relation to weather, current and sea state to minimise excessive motion and seas breaking onto

the deck;

x

If changing location from one working side to another, the move must be planned taking into account

weather and current and any new hazards that may be present;

x

Personal Protective Equipment (PPE) procedure requirements are to be followed at all times;

x

Smoking is NOT permitted on deck at any time when within the 500m zone;

x

Mobile phones

shall

not be used on deck within the 500m zone;

x

If a Permit to Work (PTW) is required, authorisation

shall

be obtained from the OIM prior to

commencing work.

4

.1.

4

P

rior to

d

e

p

art

u

re

Prior to departure, the following requirements

shall

be performed:

x

Preparation of a passage plan;

x

All cargo and back load

shall

be secured and monitored during the subsequent passage;

x

Take into account of the nature of any hazardous cargo and organise watches accordingly;

x

Expected and prevailing weather conditions are to be established and reports monitored;

x

When leaving the installation the

P

latform/Fiel

d C

oor

d

inator

shall

be given the time when leaving

the installation/500m zone, the next destination and Estimated Time of Arrival (ETA);

x

When working offshore the

E

n

g

ine Watc

h O

fficer

responsibilities include the following:

Ensure engineering watch is aware of the nature of the vessels current tasking;

Ensure instant response to command the vessel;

Maintain maximum machinery efficiency at all times;

Promote a safe working environment;

Provide immediate response to emergencies (fire, flood, collision, machinery breakdown,

steering gear breakdown);

Ensure permanent air pressure is available for sound signals;

Ensure standby machinery is at immediate notice;

Ensure emergency steering is ready for immediate operation;