Table of Contents Table of Contents
Previous Page  244-Navigation at Offshore Locations / 748 Next Page
Information
Show Menu
Previous Page 244-Navigation at Offshore Locations / 748 Next Page
Page Background

N

a

v

i

g

ation at

O

ffs

h

ore

L

ocations

BOS-PRD-07.900504

4 D

escri

p

tion

4

.1 Wor

k

in

g

at offs

h

ore locations

4

.1.1

App

roac

h

in

g

location

When approaching an offshore location the

Master/Bri

dg

e Watc

h O

fficer

shall

ensure the following:

x

The installation is identified using Automatic Identification System (AIS) and/or other means;

x

Working communications channels are established and tested, including the vessels internal

communications system;

x

Communication with the installation

shall

be maintained at all times during operations;

x

The engine room is manned;

x

Propulsion, thrusters/steering and all associated control systems are tested;

x

The sea, current, swells and wind conditions have been fully assessed;

x

The crew has been informed of the ship operations and relevant precautions and regulations;

x

The crew is aware that every crewmember has the responsibility and authority to STOP WORK if

there is any risk to the safety of personnel, assets or the environment. The situation

shall

be

reviewed by the

Master

/

Bri

dg

e Watc

h

O

fficer

and reasons for stopping work provided to the

O

ffs

h

ore

I

nstallation Mana

g

er

(OIM).

4

.1.

2 E

ntr

y

into t

h

e

500

m

z

one

Mannin

g

:

The Bridge

shall

be manned with two seamen as a minimum: one

Bri

dg

e Watc

h O

fficer

+ one

Watc

h

m

an

. Additional

O

fficers

and/or

Ratin

g

s

and

E

n

g

ine Watc

h O

fficers

in Engine Control Room will be

added at Master’s/Bridge Watch Officer’s discretion.

x

Masters

and

Bri

dg

e Watc

h

O

fficers

shall

be responsible for ensuring that this procedure is

effectively implemented. Failure to comply is a statutory criminal offence and

Masters

may be liable

to prosecution;

x

The following procedure applies to ALL situations where a vessel is required to visit, work, or

perform any operation in close proximity to platforms, drilling rigs, Floating Production, Storage and

Offloading unit (FPSO), single point moorings, sub-sea wellheads and special areas under field

development;

x

Bring the vessel to a complete stop in a safe area outside the 500m zone;

x

Complete a

500m Pre-Entry Checklist

and make an entry into the Bridge Logbook regarding

completion;

x

Make a full assessment of present and expected current, sea, wind and swell conditions;

x

Communicate with the installation and confirm the following:

Completion of the checklist;

Information relating to the planned or proposed operations;

Position and crane to be worked;

Specific information, such as, - diving - Remotely Operated Vehicles (ROV) - over-side working -

flaring, discharges (such as dry bulk venting etc.) which might impact on safety of the vessel and

crew;

Permission to enter the 500m zone;

x

Enter the 500m zone at a safe speed using manual control of steering and propulsion;

x

Whether working in manual control or Dynamic Positioning (DP) mode, the vessel

shall

be “set up” at

least 50m from the installation in order to assess the station keeping abilities;

x

Maintain station keeping for a period considered prudent with consideration to the environmental

conditions to assess acceptable station keeping and ability of crew to perform work safety; such

assessment

should

be at least 10 minutes in manual and 20 minutes in DP. Inform the installation

related to this safety assurance assessment.

x

When it is ascertained that the vessel can be operated safely - slowly maneuver into the working

position;

Version 04. Original date: 01/06/2012. Version date: 31/12/2014. Valid version only on QMS site. Uncontrolled document when printed.

Procedure prepared by: BOS Head of Operations. Approved by: BOS Head of Operations. Validated by: BOS Quality Representative.

5 / 12

244