Table of Contents Table of Contents
Previous Page  17 / 28 Next Page
Information
Show Menu
Previous Page 17 / 28 Next Page
Page Background

Record-breaking heat

exchangers for Saudi Arabia

Interviewwith

Olivier Samson

CASE STUDY

The project

In Saudi Arabia,

Mersen is helping to build

Ma’aden’s new phosphoric acid plant

scheduled

forcommissioningin2016.Theproject’sprimecontractor,

South Korea’s Hanwha Engineering & Construction,

has ordered 13 graphite tube heat exchangers, each

comprising920 seamless 5.5-meter tubes.

The challenge

Mersen is the only company capable of producing

6-meter long tubes without seams, which reduces the

risk of major breakage. But more than the length, the real

challengewas to deliver 13exchangers in just one year.

Mersen’s solution

A dedicated workshop was set up at the Pagny-

sur-Moselle facility in France to assemble several

units simultaneously. An ultra-precise process was

implemented to streamline the flow and output as soon

as the graphite was received. In addition, throughout the

project, aMersen teamwill stay in constant contact with

Hanwha andMa’aden in Seoul tomanage relations with

the various customers.

TheMersen difference

In addition to our excellent understanding of Korean

culture and organization, we offer better technology

at a more competitive cost, with isostatic graphite tube

sheets that are much more resistant than our rivals’

extruded graphite.

Pagny-sur-Moselle workshop

Highlights

A

€6-

million contract

13

graphite tube

heat exchangers

Record seamless

lengths of up

to sixmeters

A special

workshop

dedicated to

the project

in Pagny-

sur-Moselle

Scheduled

for delivery

up to2020

16 17

Olivier Samson

Project manager