BOS-PRD-07.900610

If communication from Radio Room breaks down,

H

L

O

will, as possible, co-ordinates communications with

any aircraft using his portable radio until normal communications are restored.

Adv

erse weat

h

er con

d

itions

4.7.2

The decision to operate helicopters in adverse weather can be taken by either the

H

elico

p

ter Master

or

Master

.

The

Master

, after consulting with the

Barge

Sup

er

v

isor

, will contact the

S

BV Master

to seek confirmation

that there is a good prospect of rescue and recovery in the event of a possible helicopter accident resulting

in persons entering the water. In particular, the

Master

will verify that the FRC can be safely launched.

If the current and forecasted weather and sea conditions are such that the

S

BV Master

judges the prospect

of rescue and recovery to be poor, the

Master

can decide to postpone the flight until the conditions return

within operating limits.

The

Vessel Master

has overriding responsibility for ensuring the safety of the

Vessel

and all personnel on-

board, and

shall

ensure that the decision to allow helicopter operations under adverse weather.

Loss o

f m

ain

p

ower to

h

eli

d

eck

4.7.3

Should

helicopter perimeter landing lights become unserviceable due to sudden unexpected power failure

while a helicopter is approaching the

Vessel

, the

H

L

O

should

advise the

H

elico

p

ter Master

to abort landing.

It

should

be noted that the

H

elico

p

ter Master

is solely responsibe for final decisions on helicopter

movements.

H

elico

p

ter

b

reak

d

own on

h

eli

d

eck

4.7.4

In case of mechanical failure involving a helicopter parked within the main helideck circle, the aircraft

should

be tied up using its own tie-down strops and blade socks. If necessary, alternative securing methods may be

used according to the

H

elico

p

ter Master

’s instructions.

No action

shall

be taken without consulting the “Air Operators Certificate” of the Helicopter Company. The

Master

shall

be responsible for liaising with all other relevant parties before making any decision to remove

the Helicopter from the helideck.

4.

8 R

o

u

tine

p

roce

du

res

R

e

p

orting req

u

ire

m

ents

f

or weat

h

er an

d

relate

d

in

f

or

m

ation

4.8.1

A weather status report must be faxed or emailed to the

H

elico

p

ter

Op

erator

at least one hour 15 minutes

prior to any scheduled flight departure time. The report

shall

contain weather and other information relevant

to helicopter operations. Any abnormal operations with potential impact on helicopter operation

should

be

noted in the COMMENTS section. Wherever possible, the

H

elico

p

ter

Op

erator

should

be notified well in

advance of any abnormal operations by a separate fax or telex. The weather status report

should

include

but is not limited to the following:

(a)

Date/Time of observation (U.T.C.);

(b)

Wind direction (degrees);

(c)

Wind speed (knots);

(d)

Number of PAX;

(e)

Visibility (nautical miles);

(f)

Cloud cover (octas);

(g)

Cloud base (feet) (specify if estimated or recorded);

Version 01. Original date: 8/8/2014. Version date:N/A. Valid version only on QMS site. Uncontrolled document when printed.

Procedure prepared by: BOS Ops Dpt Project Coordinator. Approved by: BOS Operations Department Director. Validated by: BOS Quality Representative.

13 / 22

435