Table of Contents Table of Contents
Previous Page  331-Bunkering Operations / 748 Next Page
Information
Show Menu
Previous Page 331-Bunkering Operations / 748 Next Page
Page Background

B

un

k

erin

g Op

erations

BOS-PRD-07.900603

4.

3 S

a

m

p

lin

g

an

d

testin

g

Sample taking is to be witnessed by the supplier whenever possible and one sealed oil sample to be kept by

the supplier and two sealed oil samples to be kept onboard by the receiver.

Samples

shall

be marked with date and supplier and stored onboard for 1 year.

Fuel oil sample label shall contain

-

Date of commencement of delivery

-

location at which and the method by which the sample was drawn

-

Name of bunker tanker

-

IMO number and name of receiving ship

-

Signature/names of the suppliers representative and ships representative

-

Details of seal identification

-

Bunker grade e.t.c.

NOTE. If sample are offered by the supplier but the sampling process was not witnessed by the receiving

vessel, chief Engineers are advised to use a stamp to indicate “for receipt purpose only source unknown’ on

the sample label.

Fuel delivery notes

shall

be maintained in an “active” file onboard for 1 year. After this period, they may be

archived accordingly as per Company filing system requirements (and archived 3 years).

For representative sampling, the sample

shall

be taken continuously during the supply or delivery (if

possible).

4.

3

.1

D

i

p

sti

ck

tests

f

or

b

a

c

teria an

d

f

un

g

us

Dipstick tests for bacterial and fungus

shall

be carried out on the following occasions:

x

At bunkering from shore installation;

x

At delivery to offshore installation (rig), and with one sample for each tank (only if possible);

x

Every month from each tank;

x

From the vessel’s day tanks and settling tanks every week;

x

The dip-stick test

shall

be left for 2-3 days before reading the result on bacterial growth, and 5-7

days for the growth of fungus;

x

The results

shall

be logged. Digital photos

should

be used to document the test result. Indications of

bacteria are to be reported as soon as they become evident; the logs

shall

be kept onboard for 3

years.

x

If the indication is on samples from the cargo, it

shall

be reported to the charterer as soon as

possible to avoid further spreading;

x

If the fuel oil is contaminated notify the charter control shore base as soon as possible so that action

can be taken to prevent contamination of other vessels and installations.

4.4

A

f

ter

b

un

k

erin

g

After bunkering the

En

g

ine Wat

c

h

O

ff

i

c

er

in charge of bunkering

shall

document the gauge readings in the

applicable Logbook.

If all is in order, the

C

hie

f

En

g

ineer

or if delegated; the

Wat

c

h

O

ff

i

c

er

in charge of bunkering

shall

sign the

delivery slip.

After ensuring that the pump has been turned off and that the valves have been shut, bunkering hoses

shall

be disconnected and rewound with care so as to avoid any pollution. The valve on board

shall

be left open to

receive any loose diesel oil that may be left in the hoses.

Any spillage

shall

be immediately cleaned up using an appropriate anti-pollution absorbent.

Version 04. Original date: 22/06/2012. Version date: 31/12/2014. Valid version only on QMS site. Uncontrolled document when printed.

Procedure prepared by: BOS Operations Department Project Manager. Approved by: BOS Head of Operations. Validated by: BOS Quality Representative.

5 / 8

331