Vessel Stabilit

y

BOS-PRD-07.900601

Good drainage of decks

shall

be maintained at all times because water on deck reduces the stability of the

vessel.

Unless otherwise specified, if the vessel is listing so that there is a danger of getting water on deck the

Maste

r

shall

make every effort to determine the cause of the list and take immediate action to reduce heel.

When pipe deck cargoes (or other cargoes liable to provide a temporary trap for water) are carried, adequate

areas

shall

be provided between adjacent stowage racks and between the vessels structure and stowage

racks to ensure free drainage of the pipe stowage positions: such areas

shall

be in excess of the freeing port

area provided.

4.

2 C

a

r

g

o

l

o

a

d

i

n

g

a

n

d d

is

c

h

a

r

g

e

When loading cargo, the

Maste

r

shall

ensure that the draft at load line mark does not exceed the Plimsol

mark.

Should the value of the Plimsol draft fall above the maximum allowed, corrective action

shall

be taken to

unburden the vessel as necessary.

Should the value of the vertical height of the centre of gravity (VCG) fall above the maximum allowed,

corrective action

shall

be taken as follows:

x

Check condition of the liquid tanks; they

should

either be full and pressed up or completely dry;

x

Head into sea;

x

Seek shelter and alert crew as good judgment dictates.

When loading cargo attention

shall

be paid to the need for maintaining freeboard at the stern with regard to

the safety of the crew working on deck and to the adverse effect trim by the stern has on the stability of the

vessel.

In addition, it

shall

be ensured that the stern trim limitation is maintained according the value given by the

instructions in the

Stability Book

.

Care

shall

be taken to ensure that the cargo allocated to the ship is capable of being stowed, so that

compliance with the criteria can be achieved.

Before a voyage commences, care

shall

be taken to ensure that the cargo and sizeable pieces of equipment

have been properly stowed or lashed; to minimise the possibility of both longitudinal and lateral shifting while

at sea under the effect of acceleration caused by rolling and pitching.

Cargo

should

be arranged, as far as possible, to be unloaded from the top, i.e. deck cargo

should

be

discharged (heaviest items first) before any under deck cargo.

4.

2

.1

L

iq

u

i

d

c

a

r

g

o

Always prefer loading tanks located at the bottom, but considering departure and arrival conditions.

Try to keep tanks distribution consistent between departure and arrival conditions at sea; E.g: minimise fluid

transfer except for consumables and fuel oil.

Always consider tanks structural limitations and restrictions on loading/unloading systems.

4.

2

.

2 B

allast ta

n

ks

Ballast tanks in any condition which are to be full

shall

be pressed full.

Tanks which are dry

should

be completely dry: left over levels/quantities

shall

be carefully estimated and

entered in the stability calculations.